Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Jinzhou City Shitan Machinery Equipment CO. LTD.
Home ProductsSoil Test Drilling Machine

XY-1A 150 Meters Rocky Mining Soil Testing Drilling Machine With Diesel Engine

Mr. Zhu is worth to be trust, he has a good team, they provide us good service and reliable quality cable.

—— Aaron

Mr. Zhu provide us Water Well Drilling Rig with good price. thank you.

—— Julien

I'm Online Chat Now

XY-1A 150 Meters Rocky Mining Soil Testing Drilling Machine With Diesel Engine

XY-1A 150 Meters Rocky Mining Soil Testing Drilling Machine With Diesel Engine
XY-1A 150 Meters Rocky Mining Soil Testing Drilling Machine With Diesel Engine XY-1A 150 Meters Rocky Mining Soil Testing Drilling Machine With Diesel Engine

Large Image :  XY-1A 150 Meters Rocky Mining Soil Testing Drilling Machine With Diesel Engine

Product Details:
Place of Origin: China
Brand Name: JINZHOU SHITAN
Certification: ISO9001
Model Number: XY-1A
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiation
Packaging Details: Standard Export Package
Delivery Time: 3-7 days
Payment Terms: T/T, Western Union
Supply Ability: 20000 sets per year
Detailed Product Description
Product Name: XY-1A 150 Meters Rocky Mining Soil Testing Drilling Machine Hole Diameter: Customized
Drilling Depth: 150 Meters Voltage: 380v
Application: Water Well Drilling ,Geological Exploration OEM: Acceptable
Power Type: Diesel Condition: New
Warranty: 1 Year Weight: 500kg
Diameter: Customized After Sale Service: Video Support
High Light:

150 Meters Soil Test Drilling Machine

,

XY-1A Soil Test Drilling Machine

,

Soil Test Drilling Machine ODM

XY-1A 150 Meters Rocky Mining Soil Testing Drilling Machine With Diesel Engine

 

 

XY-1A Soil Testing Drilling Machine​ Introduction

 

XY-1A drilling rig adds mud pump which is based on XY-1. It is a kind of hydraulic feeding, high speed, high speed torque belt and portability with pump.Construction drilling of the projects e.g. prospection, geotechnical investigation, railway, road, port, bridge, water conservancy and hydropower, tunnel, well, industrial and civil construction

 

XY-1A  Soil Testing Drilling Machine​ Technical Data

 

Drilling Rig Tech Datas
Drilling diameter(mm) 75,91,110,130,150
Drilling depth (m) 150,100,70,50,30
Drill pipe diameter (mm) 42,43
Drilling angle(°) 90~75
Equipment size(L * B * H) 1700 * 780 * 1274 (mm)
Rig weight (except engine) 540
Gyrator
Spindle speed (four gear) (r/min) 140,295,470,790,1010
Spindle travel(mm) 450
Spindle no-load lifting maximum moving speed(m/s) 0.05
Spindle no load drop maximum movement speed(m/s) 0.067
Spindle maximum feed pressure(KN) 15
Spindle maximum lifting force(KN) 25
Spindle maximum output torque(KN• m) 0.5
Winch assembly
Winch maximum lifting force (single rope)(KN) 11
Reel speed (r/min) 36,76,121
Reel circumferential speed(m/s) 0.31,0.66 ,1.05
Reel diameter(mm) 140
Wire rope diameter(mm) 9.3
Wire rope density (m) 35
Brake diameter(mm) 252
Brake band width (mm) 50
Water pump
Pump type Horizontal single cylinder double acting
Maximum displacement (motor)(L/min) 95(77)
Work pressure (Mpa) 0.7
Cylinder diameter (mm) 80
Piston stroke(mm) 100
The maximum allowable pressure (Mpa) 1.2
Oil pump
Oil pump type Gear pump
Nominal pressure (Mpa) 12.5
Rated flow(ml/r) 20
Rated speed(r/min) 800-2500

 

XY-1A Soil Testing Drilling Machine Feature:

 

1, The oil pressure feeding mechanism can improve drilling efficiency and reduce the labor intensity.

2 ,The drilling rig is equipped with a ball mounted card blessing mechanism with six side active drill rods. The utility model can perform no stopping and falling rod. And it has the advantages of high work efficiency, convenient operation, safety and reliability.

3 ,Hole pressure gauge indicates pressure which can be easy to grasp the situation inside the hole.

4, Handle concentration, easy operation.

5, It is compact, small in size, light in weight, strong in decomposition and easy to remove .It can be used in plains and mountains.

 

Why Choose Shitan Machinery Drilling Rig ?

 

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 3-7 days if the goods are in stock. or it is 7-10 days if the goods are not in stock

Q: Do you provide samples ? is it free or extra ?

A:Sorry, free sample is not available.

Q: What is your terms of payment ?A:T/T 30% in advance, then pay the 70% T/T before shipping.

Q:How to order?

A:We will recommend you the most suitable model according to information you offered.

After you send your detail requirement, we provide quotation to you.

Q:Can I expect a quality products?

A:All the production and processing are strictly according to international standard. At the same time, mature production technology ensuring the quality satisfy international request. We also welcome the third party inspection, such as BV, SGS and TUV.

 

How to install the oil cylinder of the drill tower,

 

1. When the connecting pin can not be pulled out when the rotary locking connecting rod is removed, jog repeatedly to rotate left and right. 2. Expand the track to fully expand the track width. 3. Connect the upper mast and the middle mast. Loosen the fixing pin between the upper mast and the middle mast (the folded upper mast and the middle mast must be fixed together with this pin during transportation), extend the upper mast and pulley frame to the same straight line position with the middle mast, and use bolts to reliably connect the upper mast and the middle mast. 4. Connect the lifting anchor frame to the transverse fixed beam of the pulley frame with the piston rod of the pressurizing oil cylinder with a sleeve lock rope. Operate the handle (see the operating function of the handle). Extend the piston rod of the pressurizing oil cylinder to pull up the pulley frame, so that the pulley frame support is close to the upper end face of the upper mast, and reliably connected with bolts; 5. Connect the middle mast and the lower mast, pull out the main winch wire rope to the length that is enough to lift the drill pipe, start the machine operating handle (see the handle operation function), and slowly erect the mast to the vertical state. When the lower end face of the middle mast and the upper end face of the lower mast just lean together, stop operating the mast control rod immediately, otherwise the machine parts will be damaged, and then use bolts to reliably connect the two masts. 6. Take down the lower mast support rod 7, connect the pressurizing oil cylinder and the power head, adjust the mast to the vertical, extend the pressurizing oil cylinder to the vicinity of the power head, repeatedly expand and adjust the position, and finally install the pin connecting the power head and the oil cylinder, and tighten the baffle bolt beside the pin.

 

XY-1A 150 Meters Rocky Mining Soil Testing Drilling Machine With Diesel Engine 0XY-1A 150 Meters Rocky Mining Soil Testing Drilling Machine With Diesel Engine 1

XY-1A 150 Meters Rocky Mining Soil Testing Drilling Machine With Diesel Engine 2

XY-1A 150 Meters Rocky Mining Soil Testing Drilling Machine With Diesel Engine 3

XY-1A 150 Meters Rocky Mining Soil Testing Drilling Machine With Diesel Engine 4

 

 

 

 

 

 

 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Cathy

Tel: 86-13343314303

Fax: 86-0311-84397208

Send your inquiry directly to us (0 / 3000)