Product Details:
Payment & Shipping Terms:
|
Product Name: | GK 200 Geological Drilling Rig Machine | Drilling Depth: | 200 M |
---|---|---|---|
Drilling Hole Diameter: | 300 Mm | Drilling Rod: | 50mm |
Power: | Diesel Engine | Mud Pump: | BW 160 |
After Sale Service: | Video Support | Warranty: | 12 Months |
Highlight: | water borehole drilling machine,down the hole drill rig |
GK 200 Geological Drilling Rig Machine
Product Description
GK200 is a lightweight shallow hole rig which can be drilling depth max 200M,diamter 75-300mm,with oil pressure feed.It is used for geological general investigation and exploration,road and tall buliding foundation exploration,kinds of hole in concrete structure,river levees,subgrade grouting hole drilling and driect grouting,civil wells and earth temperature entral air-conditioner,etc.
Product Parameter:
Drilling Dia | 70mm 93mm 150mm 200mm 300mm | ||
Drilling Depth | 350m 280m 220m 120m | ||
Swive Head | |||
Spindle Speed (r/min) |
Forward | 58 101 160 221 234 406 640 | |
Reverse | 46 183 | ||
Maximum Torque | 3000N*m | ||
Spindle Stroke | 600mm | ||
Maximum Cylinder lifting force | 60KN | ||
Maximum Cylinder driving force | 45KN | ||
Hoist | |||
Bobbin Diameter | 200mm | ||
Rope Diameter | 14mm | ||
Rope Capacity(5 floor) | 45m | ||
Lifting Capacity(single pipe) | 30KN | ||
Bobbin line speed (the second layer) | 0.45 0.785 1.24 1.71m/s | ||
Mobile Oil Cylinder Stroke | 460mm | ||
Distance of Step Aside The Hole | 260mm | ||
Oil Pump | |||
Name | Wheel oil pump | ||
Type | CB-E25 | ||
Displacement | 25mL/min | ||
Normal Rated Speed | 1500 r/min | ||
Normal Pressure | 16MPa | ||
Maximum Pressure | 20MPa | ||
Power | Diesel Engine | Motor | |
Type | 395K2 | Y180L-4 | |
Rated Power | 20KW | 22KW | |
Rated Speed | 1500r/min | 1470r/min | |
Dimensions | 2510*950*1820mm | ||
Weight(power not incluced) | 1300kg |
Product Main Features
1. Used for general investigation, geophysical exploration, high-way and building construction, and blast-hole drilling etc.
2. With hydro-automatic feeding device, and high drilling efficiency.
3. Designed with hydro-chucking unit instead of slips to ensure drilling from stop when changing pipes.
4. Close levers, convenient to operate, safe and reliable operations.
5. Compact in structure. All the drill, water pump and diesel engine installed on one base frame result in space-saving.
6. Light in weight, easy disassembling for transportation and applicable to working conditions in plain and mountain areas.
What are the safety precautions for geological exploration?
1. The geological exploration unit shall establish safety files for the geological exploration work area, including animal, plant and microbial injury sources, epidemic infectious diseases, epidemic infectious sources, natural environment, human geography and traffic conditions. The safety file information and preventive measures in the geological exploration work area shall be disclosed to the field operators in a timely manner.
2. Geological exploration units shall provide field survival guides and survival kits for field geological exploration operators, and provide effective radio communication equipment for field geological exploration project teams in difficult and dangerous areas.
Contact Person: Cathy
Tel: 86-13343314303
Fax: 86-0311-84397208