Product Details:
Payment & Shipping Terms:
|
Product Name: | GY 200 Exploration 300 Meters Borehole Drilling Machine For Mining Sampling | Key Words: | Exploration Drilling Rig ,Borehole Drilling Rig ,Sample Coring Rig |
---|---|---|---|
Type: | Core Drilling Rig | Model Number: | GY200 |
Certification: | SGS,CE,ISO9001 | Usage: | Water Well,Exploration |
Power Type: | Diesel | Voltage: | 240V |
Highlight: | horizontal drilling machine,horizontal water well drilling |
GY 200 Exploration 300 Meters Borehole Drilling Machine For Mining Sampling
Product Description:
Portable Rotary GY 200 Engineering Drilling Rig for the general exploration and investigation of solid mineral deposit, engineering geotectonic survey and concrete structure inspection holes.
Product Parameter:
Basic Parameter | |||||
Drilling depth | 60m | 225m | 295m | ||
Drilling diameter | 300mm | 76mm | 46mm | ||
Drill pipe diameter | 50 | 42 | |||
Spindle turnable angle | 0°~ 360° | ||||
Weight without engine | 750 kg | ||||
Dimension (length * width * height) | 1820 * 980 * 1400 mm | ||||
Rotary Table | |||||
Rotate speed | 900, 475, 388, 205, 157, 68 r/min | ||||
Maximum torque | 2000 N*m | ||||
Feeding travel | 400 mm | ||||
Maximum cylinder feeding force | 29 KN | ||||
Maximum cylinder lifting force | 39 KN | ||||
Lifter | |||||
Lifting capacity | 30 KN | ||||
Bobbin line speed, 2nd layer | 0.27, 0.64, 0.83, 1.58, 1.64 m/s | ||||
Bobbin diameter | 135 mm | ||||
Rope diameter | 12.5 mm | ||||
Rope capacity | 30 m | ||||
Oil pump | |||||
Displacement | 20 Ml/R | ||||
Rated speed | 2500 r/min | ||||
Rated pressure | 20 MPa | ||||
Maximum pressure | 25 MPa | ||||
Power | |||||
Rated power | 14 KW (Y160-4 electric), 14.7 KW (ZS-1115 diesel) | ||||
Rated speed | 1460 r/min (Y160-4 electric), 2200 r/min (ZS-1115 diesel) | ||||
Weight | 144 kg (Y160-4 electric), 190 kg (ZS-1110 diesel) | ||||
Frame | |||||
Type | Sliding type with base frame | ||||
Movable travel of drill | 400 mm | ||||
Distance between drill and hole-opening | 270 mm |
Product Features:
1. Diesel engine and electric motor as power.(convenient for places of insufficient of electricity)
2. Integrative Drilling Tower:
Tower is supported by two high strength oil cylinder, hydraulic controlling the rise and fall of the tower. The operation is extremely convenient, saving time and labor effort,creating maximum benefit for the user.
3. Crawler mobile base :
The chassis used crawler type achieve rapid turnarounds, very convenient for movement.
4. Long stroke hydraulic supporting leg can be used for transportation, loading and unloading of the drill automatically without the help of the lifting equipment. The hydraulic leg can rapidly make the drill level in the coordination with the universal level instrument.
5. electric-start diesel engine:
It greatly reduces the labor intensity of operators, especially more efficient in the cold season when the diesel engine start is difficult, showing its great advantage.
6. The machine is equipped with a complete set of independent BW - 160 mud pump, with high pump flow rate and pressure, convenient maintenance, convenient to buy spare and accessory parts all around.
The specific steps of soil sampling method are as follows:
1. Distribution: samples shall be taken according to the soil type and the distribution of crop varieties, and according to the different soil fertility. The sampling points are distributed in zigzag or snake shape, which should be as uniform and random as possible.
2. Determine the sampling position and depth: the sampling position and depth shall be determined according to the thickness of the cultivated layer. Generally, the sampling depth is 0-20cm
Contact Person: Cathy
Tel: 86-13343314303
Fax: 86-0311-84397208