Product Details:
Payment & Shipping Terms:
|
Product Name: | XY-1A Geological Drilling Rig Machine | Type: | Water Well Drilling Rig,Exploration Drilling Rig |
---|---|---|---|
Drilling Depth: | 150 Meters | Power Type: | Diesel |
Model Number: | XY-1 A | Drilling Rod Diameter: | 42mm |
Key Words: | 150 Meters,portable Rig,exploration ,sample Collecting,coring | Place Of Origin: | Hebei,China |
Color: | Yellow,Red And Blue | OEM: | Acceptable |
Warranty: | 12 Months | After Sale Service: | Video Support |
Highlight: | dth drilling machine,water borehole drilling machine |
XY-1A Geological Drilling Rig Machine
Product Description
XY-1A drilling rig is a light type machine at high speed with hydraulic feeding.Drilling rig for the general exploration and investigation of soild mineral deposit,engineering geotectonic survey and concrete structure inspection hole.
Product Parameter:
Core Drilling Rig Technical Specification
|
|
Machine
|
|
Drilling Depth | 100,180mm |
Drill Rod Dia. | 42,50mm |
Open Hole Dia. | 150mm(Rock) 300mm(Soil) |
End Hole Dia. | 46,75mm |
Angle Range | 90°-75° |
Dimensions (L×W×H) | 1710×850×1340mm |
Weight(without power unit) | 500kg |
Stroke | 350mm |
Vertical shaft
|
|
Spindle speed(5-speed) | 1010,790,470,295,140r/min |
Spindle stroke | 450mm |
Upward displacement speed of idling vertical spindle | 0.05m/s |
Downward displacement speed of idling vertical spindle | 0.067m/s |
Spindle pull-down max. | 15KN |
Spindle lifting capacity max. | 25KN |
Winch
|
|
Max. lifting capacity(single rope) | 15KN |
Lifting rotating speed | 121,76,36r/min |
Hoisting drum linear velocity(two levels) | 0.166,0.331,0.733,1.465m/s |
Drum dia. | 140mm |
Wire rope dia. | 9.3mm |
Wire rope capacity | 35mm |
Brake dia. | 252mm |
Brake belt width | 50mm |
Hydraulic Pump
|
|
Pump model | YBC-20/125 |
Rated pressure | 12.5Mpa |
Displacement | 20ml/r |
Rated speed | 1500r/min |
Power (Diesel engine or motor) | |
Model(diesel engine) | ZS1105 |
Rated power | 13.3KW/16.8KW |
Rated speed | 2200r/min |
Model(motor) | Y132M-4 |
Rated power | 7.5KW |
Rated speed |
1440r/mi
|
Product Application:
1. Engineering geological survey of railway, hydropower, traffic, bridge, dam foundation and other buildings.
2. Geological core drilling, physical survey.
3. Small grouting Confucius, blasting hole drilling.
4. Small wells drilled.
Product Features:
1. With hydraulic feed mechanism to improve drilling efficiency, reduce labor intensity.
2. The rig is equipped with a card-holding mechanism and a hexagonal active drill pipe. It can be turned down without stopping the machine. High efficiency, convenient and safe.
3. With a pressure gauge at the bottom of the hole to facilitate the control of the situation inside the hole.
4. Handle centralized, easy to operate.
5. Compact structure, small size, light weight, strong decomposition, easy to relocate.
FAQ
Q1: - Can i request customize service?
A: Yes, dear sir, we can also customize voltage, material, colour, nameplate etc., and meet your other special request.
Q2: - What is the advantage of your factory?
A: Here we're your "Chinese Partner", accurate market sharing, reliable investment suggestion, select right machine, quick problem solver, reliable after-sales service, minimize purchasing risk.
Q3: - What service do you supply after order?
A: Your order will be fully tracked including production, professional quality control, strong logistics teamwork working and experienced customs documents preparation, you can get One-stop service from us.
Q4: - How to solve the after-sales problem?
A: You can send us a video or pictures to explain the problem, later we can give you a solution to solve it, if it is our responsibility, we will 100% in charge of it and try our best to make you satisfied, we pursue long term cooperation always.
Inspection procedures for core drilling rig
I. Routine appearance inspection
(1) Regularly check whether the paint on the surface layer of the drilling rig is loose, mainly whether the operating parts are rusty;
(2) Regularly check whether the reinforcement is loose;
(3) Regularly check the welding position for faulty welding and desoldering.
II. Idle test run
(1) Carry out no-load actual operation of the drilling rig according to the safety operation procedures, and idle for 20 minutes;
(2) Regularly check whether the operation of the hydraulic transmission system is OK, whether the hydraulic seals, oil pipes and connectors have oil leakage, whether the temperature is OK, and whether the vacuum pressure gauge is OK;
(3) Regularly check whether the reinforcement is loose and whether various practical operations are sensitive and reliable.
Contact Person: Cathy
Tel: 86-13343314303
Fax: 86-0311-84397208