|
|
Product Details:
Payment & Shipping Terms:
|
| Product Name: | GK 200 Geological Drilling Rig Machine | Type: | Geological Drilling Rig |
|---|---|---|---|
| Drilling Depth: | 200 Meters | Drilling Hole Diameter: | 295mm |
| Voltage: | 380V | Dimension(L*W*H): | 3850*1500*2250MM |
| Usage: | Water Well | Application: | Water Well Drilling / Core Drilling |
| Power Type: | Diesel 58-65KW | Weight: | 550KG |
| Warranty: | 12 Months | After Sale Service: | Video Support |
| Highlight: | dth drilling machine,water borehole drilling machine |
||
GK 200 Portable Investigation Geological Drilling Rig Machine for Sample Collecting
Product Introduction
It is a light weight, efficient,muti-function device of surface drill rig, which is mainly applied to drill water wells, agricultural irrigation wells, geothermal air conditioners hole and other uses of the well hole . This drilling rig can drill in the different stratum.This rig adopts the new type of hydraulic technology,matching a high torque hydraulic rotary motor and big diameter hydraulic cylinder propel
Product Parameters:
|
GK 200 Drilling depth |
200m |
|
|
Max open hole caliber |
300mm |
|
|
End hole caliber |
75mm |
|
|
Drilling Rod diameter |
60mm |
|
|
Drilling angle |
90°~75° |
|
|
Drill rig moving stroke |
300mm |
|
|
Power Engine |
Diesel engine 22HP |
|
|
Spindle speed |
64 128 287 557 r/min |
|
|
Spindle stroke |
450mm |
|
|
Max.Single line lifting capacity |
2400kg |
|
|
Max.Single line lifting speed |
0.41 0.82 1.64m/s |
|
|
Wirerope caliber |
13mm |
|
|
Mud pump detail |
Diesel 170L/min |
|
|
Work pressure |
1.5Mpa |
|
|
Water inlet pipe diameter |
40mm |
|
|
Water outlet pipe diameter |
30mm |
|
Product Advantages:
1. With oil pressure automatic feeding mechanism, high drilling efficiency.
2. Centralized handle, convenient operation, safe and reliable.
3. The drilling rig, shifting base and diesel engine (or motor) are all installed on the same underframe, occupying a small space.
4. Light weight, strong decomposition, easy to move, suitable for plain and mountain work.
Why is the water well drilling rig not suitable for use in rainy days?
After the well is completed, it is necessary to pump water to check the results. Under normal circumstances, a large draw down pumping can be done. The stable duration of the water level shall not be less than eight hours, and the water flow of the dynamic water level of the well shall be measured at the same time. The well drilling project shall ensure the smooth drainage of the construction site, so the rainy season shall be avoided. When working while excavating, the excavation slope shall be determined according to the physical and mechanical properties of the soil layer, generally 1:1.5, and there shall be a certain distance from the toe of the spoil slope to the upper opening of the excavation. For large wells with water inflow from the shaft wall, the water inlet hole and inverted filter layer of the shaft wall must be arranged according to the design requirements, and the water inlet hole shall be prevented from being blocked during construction. The filter material enclosure at the aquifer shall meet the requirements, the backfill shall have a certain super elevation, and the frozen soil in the backfill in winter shall not exceed 15%.
Matters needing attention during the drilling process of drilling and coring machine
What should we pay attention to when drilling?
1. When drilling at ordinary times, many people will not notice the water level difference and mud concentration, which can play a protective role;
2. It is better to operate the drilling while it is hot, and it is better not to stop for a while before continuing the operation;
3. During the drilling process, control the drilling speed and slow down the drilling according to the soil quality and other conditions;
4. Strengthen the inspection of pile position and hole formation during drilling. During the final hole formation, check the position, hole diameter, shape, depth, deflection and soil quality of the pile at the bottom of the hole. After passing the inspection, clear the hole immediately, hang the reinforcement cage and pour concrete.
Jinzhou Shitan Machinery Equipment Co., Ltd. Main Products:
Pneumatic Drilling Rig / Air Drilling Rig(ST-180,ST-200,ST-260,ST-300,ST-350,ST-400,ST450,ST-450,ST-500, ST-600,ST-800 and other Pneumatic water well drilling Rigs.), Crawler Water Well Drilling Rig / Trailer Mounted Drilling Rig / Water Well Drilling Rig / Hydraulic Borewell Machine / Hard Rock Drilling Equipment / Diamond Core Drill Rig / Geological Drilling Rig / Soil Testing Drilling Rig / Portable Water Well Drilling Rig(ST-30,ST-50,XY-1A, XY-1B, XY-2, XY-2B,GK180, GK200, GY150, GY200 and 30 impact drill rig,ZLJ series tunnel drilling rig and other geological drilling machines)Crawler Track Undercarriage, Drilling Mud Pump(BW150,BW160,BW200,BW250,BW850 series Drilling mud pumps), Drilling Air Compressor, Water Well Drill Bits(PDC Drill Bit, Tricone Bit, DTH Button Bit), Water Well Drill Pipe, Drilling Rig Spare Parts( drilling rods , drilling rods joint , casing pipe, casing coupling, core tube, core tube coupling, lifters, automatic drop hammer, sampler, SPT tool, wrench fork, pad fork, lock joint), Track Transporter
Good quality, professional after-sales service, welcome to order
![]()
![]()
![]()
![]()
Contact Person: Cathy
Tel: 86-13343314303
Fax: 86-0311-84397208