Product Details:
Payment & Shipping Terms:
|
Product Name: | 150 Meters Depth High Speed XY-1A Exploration Core Drilling Rig | Drilling Depth: | 150 Meters |
---|---|---|---|
Power Type: | Diesel Power | Machine Weight: | 480kg |
Application: | Water Well,railways, Core Drilling | Dimension(L*W*H): | 1620*970*1560mm |
Drill Pipe Diameter: | 42mm | Borehole Dip Angle: | 90°~75 |
Spindle Speed: | 1010、790、470、295、140(r/min) | Rated Pressure: | 12.5Mpa |
Model(diesel Engine): | 1105 | Rated Power: | 18KW |
WEIGHT: | AROUND 600KG | ||
Highlight: | 150 meters depth core drilling rig,xy-1a core drilling rig,xy-1a exploration drilling rig |
It is efficient and convenient, designed by our company to meet the requirements of modern geological and engineering operations, and the feedback of our customers all over the world has been positive. The drill applies to reconnaissance exploration, geophysical exploration, road and building exploration and small water well drilling.
XY-1 A Core Drill Rig | |||
Drill Detail Information | Swivel Head | ||
Drilling depth
|
Max.150m |
Spindle speed
|
1010,790,470,295,140(r/min) |
Hole diameter
|
Max.150m | Spindle stroke | 450kmm |
Drill rod diameter | 42.50mm | Spindle pull-down | Max.15KN |
Angle range | 90-75 | Spindle lifting capacity | Max. 25KN |
Oil pump | Water pump | ||
Model | YBC-12/125 | Model | Horizontal reciprocating single-acting piston pump |
Rated pressure | 12.5Mpa | Working pressure | Max. 1.25Mpa |
Flow speed | 8ml/r | ||
Rated speed | 1500r/min | ||
Hoist | Power(diesel) | ||
Max. lifting capacity | 15KN | Model(diesel engine) | 1105 |
Hoisting drum revolution |
121,76,36(r/min)
|
Rated power | 18KW |
Drum diameter | 140mm | Rated speed | 2200r/m |
WEIGHT | AROUND 600KG | ||
SIZE | 1620*970*1560mm |
1. With hydro-automatic feeding device, and high drilling efficiency.
2. Designed with hydro-chucking unit instead of slips to ensure drilling from stop when changing pipes.
3. Close levers, convenient to operate, safe and reliable operations.
4. Compact in structure. All the drill, water pump and diesel engine installed on one base frame result in space-saving.
Q: what is your delivery time?
A: Generally it is 5-7 days or 7-15 days according to quantity.
Q: Where is your factory located in?
A: Our factory is located in JIN ZHOU city, HEBEI province, China.
Q: What methods of payment are accepted?
A: 30% TT down payment ,and the balance before shipment.
Q: What about the shipment?
A: Our usual loading port is Xingang port in Tianjin ,main port in north of China. The goods will be packed into bundle as 3*3,4*4 etc,black painting and thread protectors.
Q: do you have after-sale service and warranty service?
A: Any quality or quantity problem once confirmed, we will be compensate you the same. We work 7*24 online.
Q: How about your minimum order quantity?
A: At least one set.Small orders also can accept.
Contact Person: Cathy
Tel: 86-13343314303
Fax: 86-0311-84397208