Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Jinzhou City Shitan Machinery Equipment CO. LTD.
Home ProductsEngineering Drilling Rig

200 Meters Engineering Drilling Rig Gold Mining Core Sampling Machine

Mr. Zhu is worth to be trust, he has a good team, they provide us good service and reliable quality cable.

—— Aaron

Mr. Zhu provide us Water Well Drilling Rig with good price. thank you.

—— Julien

I'm Online Chat Now

200 Meters Engineering Drilling Rig Gold Mining Core Sampling Machine

200 Meters Engineering Drilling Rig Gold Mining Core Sampling Machine
200 Meters Engineering Drilling Rig Gold Mining Core Sampling Machine 200 Meters Engineering Drilling Rig Gold Mining Core Sampling Machine

Large Image :  200 Meters Engineering Drilling Rig Gold Mining Core Sampling Machine

Product Details:
Place of Origin: China
Brand Name: JINZHOU SHITAN
Certification: ISO
Model Number: GK200
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiation
Packaging Details: Standard Export Package
Delivery Time: 7-12 days
Payment Terms: L/C, D/A, D/P, T/T, Western Union
Supply Ability: 2000 sets per year
Detailed Product Description
Name: GK 200 Geological Drilling Rig Machine Power Type: Diesel
Usage: Water Well Voltage: 380V
Power(W): 15KW Weight: 626KGS
Condition: New Equipment Size(L * B * H): 1730 * 860 * 1360 (mm)
After-sales Service Provided: Engineers Available To Service Machinery Overseas Warranty: 1 Year
Drilling Diameter: 75-325mm Mud Pump: BW-160
High Light:

200 meters engineering drilling rig

,

diesel power engineering drilling rig

,

200 meters engineering drill rig

200 Meters Gold Mining Core Sampling Engineering Drilling Rig Machine

 

 

GK 200 Core Engineering Drilling Rig Information

 

It is a kind of hydraulic feed drilling rig, which has the characteristics of large power, large lifting force and large transmission torque. It is suitable for geological exploration, geological core drilling, small irrigation holes, blasting holes and small water wells of railway, water conservancy, bridge, dam foundation and other buildings. The drilling rig is light in weight, strong in decomposition, easy to move, and suitable for work in plain and mountainous areas.

 

GK 200 Core Engineering Drilling Rig Technical Data

 

Drilling depth 200m
Drilling Diameter 91mm,110mm,130mm,150mm,300mm
Drilling rod diameter 50mm
Drilling Angle 90°-75°
Dimensions(L×W×H) 1750×850×1300 (mm)
Weight 880kg/set
Spindle Speed 115, 230, 505, 790, 1010 r/min
Spindle stroke 450mm
Spindle Dia. Φ59mmx53mmx4350mm Kelly rod
Upward displacement speed of drilling vertical spindle 0.05m/s
Downward displacement speed of drilling vertical spindle 0.067m/s
Spindle pull-down max 15KN
Spindle lifting capacity max 25KN
Vertical maximum output torque 1.5KN.m

 

GK 200 Engineering Drilling Rig Advantages

1.With hydraulic feeding device, elevated drilling efficiency, reduced labor strength.
2.The rig is equipped with an upper spherical jaw holding mechanism and hexagonal drive drilling rod which can be replaced without
shutdown, high efficiency, safe and reliable.
3. A hole bottom pressure gauge is mounted indicating the pressure in order to control the status inside the hole.
4.Compact structure, small volume, lightweight, high detachability, easy transportation and suitable for the operations in plains


GK200 Engineering Drilling Rig Applications


1. Drillings for the general exploration and investigation of solid mineral deposit, engineering geotectonic survey a
2.Diamond drill bit, alloy drill bit and steel roller drill bit and so on are available for drilling according to different geological structures.
3.When the final holes are respectively 75mm and 46mm in diameter, the rated hole depths are separately 100m and 180m. The maximum
of depth may not exceed 110% of that drilled in each hole. The maximum allowable hole diameter is 150 mm.

 

The main causes of drill pipe fracture 

 

1, The bending moment of drill pipe is too large during reaming and pipeline pullback;

2, The causes of excessive bending moment are as follows: first, the actual curve of the guide hole deviates greatly from the theoretical curve; Second, the hole after reaming is irregular, which makes the pipe form an angle with the reamer and the drill pipe axis.

Other reasons:

1, In order to save investment, the directional drilling equipment used by the construction contractor (i.e. Party A) does not match the actual needs of the project construction. The tonnage of the directional drilling equipment is too small, the maintenance is not timely, and the failure rate is high, which makes the directional drilling force uneven. At the same time, the stop and go construction makes the hole forming quality poor, the hole irregular, the drilling tool is easy to lock, resulting in the fracture of the drill pipe;

2, The selection of reamer model is unreasonable. Failure to select the matching rule model according to the actual geological conditions, resulting in increased drilling torque, increased drill pipe wear and fracture;

3, When the rock reamer reams or cleans the hole, the drill pipe is not connected at the back, and the reamer swings greatly in the hole, which may cause the drill pipe and the main shaft of the reamer to break;

200 Meters Engineering Drilling Rig Gold Mining Core Sampling Machine 0
 

200 Meters Engineering Drilling Rig Gold Mining Core Sampling Machine 1200 Meters Engineering Drilling Rig Gold Mining Core Sampling Machine 2

200 Meters Engineering Drilling Rig Gold Mining Core Sampling Machine 3200 Meters Engineering Drilling Rig Gold Mining Core Sampling Machine 4200 Meters Engineering Drilling Rig Gold Mining Core Sampling Machine 5200 Meters Engineering Drilling Rig Gold Mining Core Sampling Machine 6

 

 

 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Cathy

Tel: 86-13343314303

Fax: 86-0311-84397208

Send your inquiry directly to us (0 / 3000)