Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Jinzhou City Shitan Machinery Equipment CO. LTD.
Home ProductsCrawler Mounted Drill Rig

High Speed Hydraulic Crawler Drilling Rig St 350 Meters Deep For Business

Mr. Zhu is worth to be trust, he has a good team, they provide us good service and reliable quality cable.

—— Aaron

Mr. Zhu provide us Water Well Drilling Rig with good price. thank you.

—— Julien

I'm Online Chat Now

High Speed Hydraulic Crawler Drilling Rig St 350 Meters Deep For Business

High Speed Hydraulic Crawler Drilling Rig St 350 Meters Deep For Business
High Speed Hydraulic Crawler Drilling Rig St 350 Meters Deep For Business
video play

Large Image :  High Speed Hydraulic Crawler Drilling Rig St 350 Meters Deep For Business

Product Details:
Place of Origin: China
Brand Name: ShiTan
Certification: ISO9001
Model Number: ST 350
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiation
Packaging Details: Wooden box
Delivery Time: Within 7-12 days
Payment Terms: T/T, Western Union
Supply Ability: 20000 sets per year
Detailed Product Description
Product Name: High Speed St 350 Meters Deep Crawler Mounted Drill Rig For Business Color: Red Yellow Blue
Feature: High Drilling Efficiency Application: Water Well Drilling
Power Type: Diesel Drilling Depths: 350 Meters
Drilling Hole Diameters: 105-305 Mm Warranty: 1 Year
Voltage: 220V/380V Length Of Drill Pipe(mm): 3m
Condition: New After-sale Service: Working Video Support
High Light:

high speed hydraulic crawler drilling rig

,

350 meters hydraulic crawler drilling rig

,

crawler mounted water borehole drilling machine

High Speed St 350 Meters Deep Crawler Mounted Drill Rig For Business

 

 

ST 350 Crawler Mounted Drill Rig Introduction

 

It is mainly used to drilling wells,irrigation wells,ground source heating pump wells and boreholes ,especially for mountain and rock formation well projects,the drilling depth is 350 meters ,hole-diameter is 105-350 mm ,lift power is 24MT.

 

ST 350 Crawler Mounted Drill Rig Tech Details

 

Drilling depth 350m
Dia.hole φ105-305mm
Advance Length one time 6.6m
Working pressure 1.7-3.3MPa
Air consumption 17-35m³/min
Length of rod 1.5m,2m,3m, (6m can be choosed)
Dia. Of rod φ89,φ102,φ114
Lifting power 24T
Rotation torque 6200-8500 N.m
Rotation Speed 55-115r/min
Diesel Engine Yuchai
Engine Power 85Kw/2200rpm
Travelling speed
0-2.5 Km/h
Climb capacity 30°
Weight 9000kgs
Dimension 5500x1900x2780mm
Application Complicated geological conditions: Rock, Mud, Sand etc.
Drilling Way Top drive hydraulic rotary and propulsion, Dth Drilling or Mud Pump Driling
DTH Hammer 4",5",6",8",10" Drill hammer or CIR110, 130, 150,170

 

ST 350 Crawler Mounted Drill Rig  Advantages

 

With hydraulic technology,supporting high torque hydraulic motor rotation and large bore hydraulic cylinder push, the multi cylinder engine of famous factory provides power for the hydraulic system, two stage air filter, air compressor air intake design

 

Working Attentions During Drilling Work

 

First of all, the temperature of hydraulic oil is too high. According to hydraulic theory and maintenance experience in recent years, the main reason for the high temperature of hydraulic oil is too fast heat generation and too slow heat dissipation. The oil inlet pipeline and hydraulic oil tank of the hydraulic pump are not sealed tightly, the oil inlet filter element is blocked, the hydraulic system pipeline is not unblocked, and the internal leakage of the hydraulic pump will cause a large amount of heat to be generated in the hydraulic oil, so that the temperature of the hydraulic oil will rise rapidly due to excessive heat generation.

Cause and judgment of drill pipe sliding down

Fault cause:

The drill pipe is fixed on the main winch drum through the steel wire rope, and the drill pipe can be raised or lowered accordingly when the drum is wound or released with the steel wire rope. The power of the drum comes from the main winch motor that has been decelerated for many times. Its stop is realized by the brake directly installed on the reducer. During the lifting or lowering of the drill pipe, if the operating handle is returned to the middle position and the drill pipe cannot stop quickly, there may be three reasons: first, the brake lag; Second, the two hydraulic locks at the outlet of the motor end fail, and the motor cannot stop rotating immediately under the effect of the torque of the wire rope; Three reasons are easy to be ignored. All engineering drilling rigs have a drill pipe release function. The function is that the solenoid valve 3 provides release brake signal oil, and then the solenoid valve 2 connects the oil inlet and outlet of the main winch motor through two oil pipes, so as to ensure that the drill bit can always contact the working face and have a certain pressure during drilling. Under other working conditions, the solenoid valve 2 will disconnect the two oil pipes leading to the inlet and outlet of the motor. If the disconnection is not timely, the above-mentioned fault phenomenon will occur.

 

High Speed Hydraulic Crawler Drilling Rig St 350 Meters Deep For Business 0

High Speed Hydraulic Crawler Drilling Rig St 350 Meters Deep For Business 1

High Speed Hydraulic Crawler Drilling Rig St 350 Meters Deep For Business 2
 


 
 
 
 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Cathy

Tel: 86-13343314303

Fax: 86-0311-84397208

Send your inquiry directly to us (0 / 3000)