Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Jinzhou City Shitan Machinery Equipment CO. LTD.
Home ProductsWater Well Drilling Rig

Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200

Mr. Zhu is worth to be trust, he has a good team, they provide us good service and reliable quality cable.

—— Aaron

Mr. Zhu provide us Water Well Drilling Rig with good price. thank you.

—— Julien

I'm Online Chat Now

Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200

Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200
Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200 Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200

Large Image :  Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200

Product Details:
Place of Origin: China
Brand Name: JINZHOU SHITAN
Certification: ISO
Model Number: ST 200
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiation
Packaging Details: Standard Export Package
Delivery Time: 7-10 days
Payment Terms: T/T, Western Union
Supply Ability: 2000 sets per year
Detailed Product Description
Product Name: ST 200 Water Well Drilling Rig Model Number: ST 200
Machine Type: Drilling Equipment Certification: ISO
Hole Diameter: Customized Drilling Depths: 200 Meters
Condition: New Weight: 8.9 T
Warranty: 12 Months Rotation Torque: 7500Nm, 983 N.m, 4200N.m, 3400mm
Air Consumption: 16-30 M3/min, 20-100m3/min, 17-31m3/min, 16-30cubic Meter/min
High Light:

200M Depth Water Well Drilling Rig

,

Water Well Drilling Rig ST 200

,

2.5km/h Water Well Drilling Equipment

Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200

 

 

ST 200 Water Well Drilling Rig Description

 

It is 200 meters depth and 305mm hole diameter ,especially a kind of high-efficiency and multi-functional drilling equipment, which is mainly applicable to drilling water wells and agriculture Irrigation wells, ground source heat pump wells and well holes for other purposes, especially suitable for water intake projects in mountainous areas and rock formations

 

ST 200 Water Well Drilling Rig Tech Data

 

Drilling Diameter 140-305mm
Drilling Depth 200 meters 
Mobility yes
drill pipe diameter(mm) 76 89
the hole diameter(mm) 140-305
drill pipe length(M) 1.5 2.0 3.0
one-time advance length(m) 3.3
walking speed(km/h) 2.5
equipped capacitor(kw) 70
using air pressure(MPA) 1.7-3.0
swing speed(rpm) 45-70

 

ST 200 Water Well Drilling Rig Advantages

 

1. It is hydraulically driven by diesel engine.
2. The dashboard is simple and clear. It is a crawler mounted structure, which is easy to move.
3. Four standard high legs . When loading by car for a long transportation, you can directly get on the car without lifting.
 

ST 200 Water Well Drilling Rig Applications

 

The utility model relates to an efficient and multifunctional drilling equipment, which is mainly suitable for drilling wells, agricultural irrigation wells, ground source heat pump wells and other wells, especially for water intake projects in mountain areas and rock formations. The drill can be used for drilling in different formations, and the maximum drilling diameter can reach 350mm.

The drilling rig adopts new hydraulic technology, supporting large torque hydraulic motor rotation and large-diameter hydraulic cylinder propulsion. The engine of the famous factory provides power for the hydraulic system. The two-stage air filter and the intake design of the compressed air lead extend the service life of the diesel engine. The unique pump unit design facilitates maintenance and reduces maintenance cost. Centralized control hydraulic console for easy operation.

 

Four aspects of rural water wells

 

1, Select appropriate well type

The well types of water source wells are divided into deep wells, large wells, counterpart pumping wells, foreign wells, and small-diameter tube wells. In areas with abundant deep groundwater, it is appropriate to drill deep wells. In areas with abundant shallow groundwater, it is appropriate to drill large wells, counterpart pumping or small-diameter tube wells.

2, Reasonable well layout

The location and layout of wells shall be reasonably arranged according to the local actual hydro geological conditions. If there is no hydro geological data, refer to the existing water source wells around as the basis for the layout of wells. In areas where shallow groundwater is not abundant, shallow wells should not be drilled blindly; In areas with abundant shallow groundwater, it is suitable for farmers to build their own shallow wells, but the well hole layout should not be too dense to avoid the interaction between adjacent water source wells.

3, Configure appropriate water pump

After the well is completed, measure the water level of the water outlet well and the corresponding water output according to the drainage condition of the drilling machine, and then determine the total head of the water pump according to the height difference from the ground to the dynamic water level and the irrigation method you adopt, and the required working head of the water pump. The flow of the water pump shall not exceed the water flow through the well. The corresponding water pump shall be purchased on the premise of the above two items.

 

Drilling operation technology

① Proper casing shall be put into the hole to avoid hole collapse.

② When the drilling tool is lowered into the hole, first use low-pressure slow rotation to sweep the hole to the bottom. When the resistance of the drill bit in the hole is small, it can be turned into normal drilling. If the resistance in the hole is large, it cannot be forced to open the high speed.

③ During normal drilling, the drilling parameters shall not be changed arbitrarily, and the drilling tools shall not be lifted to prevent the core from being blocked.

④ When the core is found to be blocked, the drilling tool can be lifted appropriately. If the treatment is ineffective, the drilling tool should be lifted immediately.

⑤ If the formation is loose, the particle size of sand and gravel is very small, and it is difficult to coring, the pump volume should be reduced.

⑥ If the drilling speed of sand and gravel suddenly accelerates, it may be to drill into the sand layer or the gravel layer with small particle size. It is not necessary to change the drilling parameters, but the pump volume should be reduced as much as possible.

⑦ In order to ensure that the core is drilled into thin sand and mud layers, it is best to drill more than 10 cm into the pebble layer after drilling. If the sand layer is thick, when one round of drilling cannot be penetrated, the pump should be stopped at the end of the round to dry drilling for more than 10 cm and then lift the drill to prevent the core from falling off.

⑧ Carefully operate during drilling, and often observe whether the water supply system is unblocked and whether the water pump operates normally. When there is no slurry return in the hole, slurry breaking shall be prevented. In case of sudden increase in pump pressure, immediately lift the drill for inspection to prevent burning.

⑨ when drilling and sampling in important hole sections, the drill rod should be slowly lifted and screwed down to prevent the core from falling off. When withdrawing the core, the drill bit should be removed and then the core should be gently poured out.

Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200 0

Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200 1

Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200 2Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200 3

 

 

 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Cathy

Tel: 86-13343314303

Fax: 86-0311-84397208

Send your inquiry directly to us (0 / 3000)