Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Jinzhou City Shitan Machinery Equipment CO. LTD.
Home ProductsCrawler Track Undercarriage

Mining Exploration Rig Customized Capacity Crawler Track Undercarriage Construction Platform

Mr. Zhu is worth to be trust, he has a good team, they provide us good service and reliable quality cable.

—— Aaron

Mr. Zhu provide us Water Well Drilling Rig with good price. thank you.

—— Julien

I'm Online Chat Now

Mining Exploration Rig Customized Capacity Crawler Track Undercarriage Construction Platform

Mining Exploration Rig Customized Capacity Crawler Track Undercarriage Construction Platform
Mining Exploration Rig Customized Capacity Crawler Track Undercarriage Construction Platform Mining Exploration Rig Customized Capacity Crawler Track Undercarriage Construction Platform

Large Image :  Mining Exploration Rig Customized Capacity Crawler Track Undercarriage Construction Platform

Product Details:
Place of Origin: Jinzhou ,China
Certification: ISO
Model Number: Shitan T1
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Customzied Quotation list
Packaging Details: 1*20 FCL
Delivery Time: 5 days after advance payment
Payment Terms: T/T, Western Union
Supply Ability: 1000 Sets/month
Detailed Product Description
Brand Name: Shitan Product Name: Mining Exploration Rig Customized Capacity Crawler Track Undercarriage Construction Platform
Loading Capacity: Customized Raw Material: Alloy Steel
OEM: Acceptable Power: Diesel Engine
Warranty: 12 Month After Sale Service: Video Support
Application: Drilling Rigs Speed: Customized
High Light:

Customized Capacity Crawler Track Undercarriage

,

Exploration Rig Crawler Track Undercarriage

,

Customized Capacity Rubber Crawler Track

Mining Exploration Rig Customized Capacity Crawler Track Undercarriage Construction Platform

 

 

Product Description

 

It is made of high-strength alloy steel, and is composed of sealed track chains. The track shoe is fixed on the rail joint with high-strength bolts, and the chain rail joint and the rail are slightly pressed together with the chain rail sleeve in the way of interference fit. This vehicle uses a track with a pitch of 135mm. The track of the track is slightly sealed with a special rubber ring to prevent sand, water and other abrasive particles and corrosive media from entering the mating surface of the relative rotation. This new type of track has greatly improved the service life of the track. Even if it is used for rock roll operation, it can also avoid the excessive wear and snake-like phenomenon of the track.

 

Product Tech Details

 

Type :Customized Capacity Bucket size: 2200*1700*500 mm
Size: 3400 *1720*1500mm Crawler material: Rubber material
Track ground length: 1600mm Loading &unloading method: Hydraulic dump
Motor size: 1115 Gear type: drawbar
Gear: +3 forward gear+1 reverse gear The height from the bottom of the bucket to the ground: 700 mm
Steering method: Clutch brake steering Start method: Electric start
Speed : 0-18 Kilometer per hour Crawler Width size: 1630 mm

 

Track classification

 

The tank track can be divided into two types according to its structure: metal pin hinge type and metal rubber hinge type. Metal rubber hinge can be divided into single pin type and double pin type.

The metal pin type crawler has simple structure, the pin and pin hole are directly dry friction, wear fast, and short service life. During tank maintenance, it is often found that the track pin is grinded into a "Tomatoes on sticks" shape. The track pin is also one of the wearing parts.

The metal rubber articulated track is vulcanized with multiple rubber collars on the metal pin and pressed into the track shoe pin hole. In this way, there is no direct friction between the track pin and the track shoe pin hole. When twisting, only the rubber collar produces elastic torsion, with low noise and long service life. Of course, the structure is also complex and the cost is high. The double-pin metal rubber track connects the two pins of the two track shoes with the end connector. The force is good and the disassembly and assembly are convenient, but the structure is complex, which is the main track form on the main battle tank

 

Product Main Applications

 

Rubber Crawler

Rubber track chassis is mostly applicable to small light industry and small construction machinery industry. Light industry is generally agricultural machinery within one ton to four tons. The construction machinery industry is mainly used in the small drilling industry.

Steel track

The range of use and service life of steel track and the selection of working conditions are relatively broader. It is composed of steel track, shoe wheel, guide wheel, roller, chassis and two traveling reducers (the traveling reducer is composed of motor, gearbox, brake and valve body). Generally, for example, the drilling rig is arranged on the chassis as a whole, and the walking speed of the crawler chassis can be adjusted by the control handle, which can make the whole machine realize convenient movement, turning, climbing, walking, etc

 

Routine maintenance of hydraulic system

 

1. The machine shall be cleaned before the end of each shift to remove the gangue and other debris in the middle of the track.

2. Check and tighten loose track shoe bolts and connecting bolts of structural parts every shift, and replace damaged ones in time.

3. Check whether each pipe joint leaks oil and whether each hose is squeezed or worn.

4. Check the return oil filter every shift within one month after the new machine is used, and replace the filter element according to the situation. After one month, replace the filter element once a month. (The filter element is made of paper, a few low-value consumables, and cannot be reused after cleaning)

5. Check the condition of hydraulic oil every shift. Observe the level of the liquid level gauge on the auxiliary oil tank and replenish the oil in time. Too low liquid level will cause premature failure of the triple pump suction. Hydraulic oil shall be stored in special sealed containers. During ground maintenance, oil should be added to the system through the oil filter. At the construction site, oil must be added through the oil return filter on the top of the auxiliary oil tank of the machine. The oil filler should be cleaned with a cloth that does not shed wool before refueling.

6. Each shift must check the passing condition of the oil filter within one month after the new machine is used. When the filter element is blocked or damaged, the filter element should be replaced in time. After one month, replace the filter element once a month. The old filter element cannot be reused.

7. Clean the scale on the inner wall of the cooler with special cleaning agent every six months.

 

Mining Exploration Rig Customized Capacity Crawler Track Undercarriage Construction Platform 0

Mining Exploration Rig Customized Capacity Crawler Track Undercarriage Construction Platform 1

Mining Exploration Rig Customized Capacity Crawler Track Undercarriage Construction Platform 2

Mining Exploration Rig Customized Capacity Crawler Track Undercarriage Construction Platform 3

Mining Exploration Rig Customized Capacity Crawler Track Undercarriage Construction Platform 4Mining Exploration Rig Customized Capacity Crawler Track Undercarriage Construction Platform 5

 

 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Cathy

Tel: 86-13343314303

Fax: 86-0311-84397208

Send your inquiry directly to us (0 / 3000)