Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Jinzhou City Shitan Machinery Equipment CO. LTD.
Home ProductsWater Well Drilling Rig

ST 300 Trailer Mounted Water Well Drilling Rig With Drill Hole 300mm

Mr. Zhu is worth to be trust, he has a good team, they provide us good service and reliable quality cable.

—— Aaron

Mr. Zhu provide us Water Well Drilling Rig with good price. thank you.

—— Julien

I'm Online Chat Now

ST 300 Trailer Mounted Water Well Drilling Rig With Drill Hole 300mm

ST 300 Trailer Mounted Water Well Drilling Rig With Drill Hole 300mm
ST 300 Trailer Mounted Water Well Drilling Rig With Drill Hole 300mm ST 300 Trailer Mounted Water Well Drilling Rig With Drill Hole 300mm

Large Image :  ST 300 Trailer Mounted Water Well Drilling Rig With Drill Hole 300mm

Product Details:
Place of Origin: China
Brand Name: ST
Certification: ISO
Model Number: ST-100
Payment & Shipping Terms:
Minimum Order Quantity: 1 SET
Packaging Details: 1, plastic bags inside,wooden boxes outside,or as customers'request 2, seaworthy packing
Detailed Product Description
Drilling Diameter(mm): 75,100 Drilling Depth (m): 100
Drill Pipe Diameter (mm): 42 Drilling Angle(°): 90-75
Equipment Size(L * B * H): 1640 * 1030 * 1440 (mm) Rig Weight (except Engine): 500
High Light:

water borehole drilling equipment

,

hydraulic water well drilling machine

ST 300 Trailer Mounted Water Well Drilling Rig With Drill Hole 300mm

 

ST 300 Trailer Mounted Water Well Drilling Rig With Drill Hole 300mm is designed on the basis of ST 100. It is a kind of low speed and big torque portable drilling machine with hydraulic feeding. It is compact, small in size, light in weight, strong in decomposition and easy to remove .


1.1 Engineering geological investigation of railways, hydropower, traffic, bridges, dam foundations and other buildings.

1.2 Geological core drilling, physical prospecting.

1.3 Small grout Confucius, drill hole drilling.

1.4 Small well drilling

 

Q1. How to choose the right model?

A:
1.Make sure of the diameter and the depth of hole to be drilled.
2.Make sure of the ground type to be drilled.

Q2. What about the lead time?

A:Needs 3-5 days, mass production needs 1-2 weeks.

Q3. How do you ship the goods and how long does it take to arrive?

A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.

Q4. How to proceed an order for Drilling Machine?

A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer places deposit for formal order.
Fourthly We arrange the production.

 

ST 300 Trailer Mounted Water Well Drilling Rig With Drill Hole 300mm 0

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Anna

Tel: 86-15630441112

Fax: 86-0311-84397208

Send your inquiry directly to us (0 / 3000)