Product Details:
Payment & Shipping Terms:
|
Product Name: | Water Well Drilling Rig | Model: | ST 350 Crawler Mounted |
---|---|---|---|
Machine Type: | Drilling Equipment | Certification: | ISO |
Hole Diameter: | Customized | Drilling Depths: | 350meters |
Condition: | New | Weight: | 8.9 T |
Warranty: | 12 Months | Rotation Torque: | 7500Nm, 983 N.m, 4200N.m, 3400mm |
Air Consumption: | 16-30 M3/min, 20-100m3/min, 17-31m3/min, 16-30cubic Meter/min | After Sale Service: | Video Support |
Highlight: | groundwater resource portable borehole drilling machine,pneumatic portable borehole drilling machine,350m water well drilling rig |
ST-350 Pneumatic Drilling Rig High Speed Groundwater Resource Water Well Drilling Rig
ST 350 Water Well Drilling Rig Introduction:
It is suitable for industrial and civil drilling and geothermal drilling. It has the advantages of large drilling diameter, deep drilling, fast footage, flexible movement and so on
ST 350 Water Well Drilling Rig Technical Data:
Product Name | ST 350 |
Power Type | Diesel |
Place of Origin | China |
Brand Name | SHITAN |
Usage | Water Well Drilling Rigs |
Dimension(L*W*H) | 6400MM*2250MM*2700MM |
Weight Of Machine | 8.9 T |
Certification | ISO9000 |
Warranty Time | 12 Months |
Color | Blue,red ,yellow |
Drilling diameter | 152mm-305mm |
Depth | 25M |
Rotary speed | 0-90rpm |
DTH | K40 |
Drilling Rods | 76*2m+76*3m |
Air consumption | 13-20m3/min |
Travelling speed |
0-2.5km/h
|
ST 350 Water Well Drilling Rig Main Advantage:
Water Well Drilling Rig Working Process:
1. It is necessary to measure the distance during drilling. Generally, drill 10m each time or replace the drill bit, measure the drill pipe once, check the drilling depth, and modify it if necessary. Check whether the gearbox, bushing and vertical shaft gear are overheated and whether there is abnormal sound. If any problem is found, stop in time, find the cause and stop solving the problem.
2. When excavating with clean water, do not supply water before excavation. In addition, water can only be drilled after return. And make sure you have enough traffic. The rock powder in the hole takes a long time. Increase the water volume to prolong the service time of the pump, and wait until before drilling.
3. When replacing drilling tools, Changsha drilling platform is generally required to measure every 10m to change the drilling depth. Even if the gearbox, bushing, vertical shaft gear and other overheating phenomena occur, there will be no abnormal sound. If there is any problem, please stop immediately, investigate the cause and deal with it within a time.
Contact Person: Cathy
Tel: 86-13343314303
Fax: 86-0311-84397208