Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Jinzhou City Shitan Machinery Equipment CO. LTD.
Home ProductsCrawler Mounted Drill Rig

High Speed Residential Water Well Borehole Blasting ST 180 Crawler Mounted Drill Rig

Mr. Zhu is worth to be trust, he has a good team, they provide us good service and reliable quality cable.

—— Aaron

Mr. Zhu provide us Water Well Drilling Rig with good price. thank you.

—— Julien

I'm Online Chat Now

High Speed Residential Water Well Borehole Blasting ST 180 Crawler Mounted Drill Rig

High Speed Residential Water Well Borehole Blasting ST 180 Crawler Mounted Drill Rig
High Speed Residential Water Well Borehole Blasting ST 180 Crawler Mounted Drill Rig High Speed Residential Water Well Borehole Blasting ST 180 Crawler Mounted Drill Rig

Large Image :  High Speed Residential Water Well Borehole Blasting ST 180 Crawler Mounted Drill Rig

Product Details:
Place of Origin: China
Brand Name: ShiTan
Certification: ISO9001
Model Number: ST180
Payment & Shipping Terms:
Minimum Order Quantity: 1sets
Price: Negotiation
Packaging Details: Wooden box
Delivery Time: Within 7-12 days
Payment Terms: T/T, Western Union
Detailed Product Description
Product Name: High Speed Residential Water Well Borehole Blasting ST 180 Crawler Mounted Drill Rig Drilling Depth: 180 Meters
Color: Red Yellow Blue Feature: High Drilling Efficiency
Application: Water Well Drilling Power Type: Diesel
Drilling Angle: 90° ~75° Warranty: 1 Year
Voltage: 220V/380V Engine: Diesel Engine
Support: Video Support Place Of Origin: Hebei,China
High Light:

180m crawler mounted drill rig

,

residential crawler mounted drill rig

,

180m water well crawler drill rig

High Speed Residential Water Well Borehole Blasting ST 180 Crawler Mounted Drill Rig

 

 

Product Description

 

ST 180 drilling rig can drill in hilly, mountainous and other rocky areas,this drilling rig can be used in industrial and civil drilling, geothermal drilling, environmental monitoring drilling and so on.Pneumatic water well drilling machine can work together with air compressor, it can add mud pump and foam pump. Need to use different drilling tools such as: drill rod, hammer, rock drill bits, etc.

 

Product Technical Information

 

Model ST 180
Operating weight (T) 4.5
The hole diameter (mm) 140-254
Drilling depth (m) 180
One time advance length (m) 3.3
Walking speed (km/h) 2.5
Climbing angels (Max.) 30
Rated power (kw) 55
Working pressure (mpa) 1.7-2.5
Air consumption (m3/min) 17-31
Drill pipe diameter (mm) 76 /89
Drilling pipe length (m) 1.5/2.0/3.0
Rig lifting force (t) 12
Swing speed (rpm) 45-65
Swing torque (N.m) 3200-4600
Dimensions (mm) 3800*1500*2200

 

ST 180 Crawler Mounted Drilling Rig Feature 

 

1.The width is only 1.3m, suitable for narrow drilling condition, and the max drilling depth 

2.In order to fulfill various application cases, the main parameters of drill can be adjusted, such as rotation speed, torque, feeding pressure anti-feeding pressure, feeding speed, lifting speed.

3.Easier for rod changing, reducing rod changing time, better for follow – down drilling.

4. Multiple drilling ways could be worked on this rig, such as DTH drilling, anti-air circulation drilling, anchor drilling, rotation drilling, and follow-down drilling, as well as core drilling.

5. Down the hole drilling for rocks has the lowest drilling cost with highest level of working productivity.

6. Long stroke jack cylinders are easy for truck self loading during transportation, and crawlers are of better mobility in mud working sites.


ST 180 Crawler Mounted Drilling Rig FAQ

 

Q 1: What kind of drilling rig do you have?

A: We mainly produce small hydraulic drilling rig, water well drilling rig, core drilling rig, engineering drilling rig, geological exploration drilling rig, etc., and we will recommend the suitable model according to your exact requirement .

Q 2: Where is the address of your company?

A: Our factory is in Jinzhou, Shijiazhuang City, Hebei Province, China

Q 3: Are you a manufacturer or a trading company?

A:We are a 20 years professional manufacturer with ISO certificate. We have a large modern drilling rig plant in Hebei, China.

Q 4: How long is your delivery time?

A: Small hydraulic drilling rigs generally take 5-7 days, and large pneumatic water well drilling rigs generally take 7-15 days. If there is an urgent order, please contact our sales in advance.

Q 5: How long is the warranty of your well drilling rig?

A: Except for consumable spare parts, the whole machine shall be one year.

Q6: How long can your air compressor be used?

A: Normally more than 10 years.

Q 7: What are the terms of payment?

 

How can we make the service life of the water well drill longer? This requires us to pay attention to the careful maintenance of the machine in the process of daily use. What should we pay attention to every day?

 

First of all, check the structure of the water well drilling rig, especially before use, check the integrity of parts and components, and put it into use only after it is qualified. In the process of use, various power head oil cylinders and other places shall be inspected regularly to ensure their normal operation.

The electrical system shall also be inspected regularly, as well as the pulley system and traveling system of the drilling rig. Better maintenance records shall be made for each physical examination of the equipment, and records shall also be made for each replacement of parts. If problems are found, the operation must be stopped to avoid unnecessary losses.

Pay attention to some operation methods during use. Pay attention to the lubrication of parts and apply lubricating oil appropriately. When the working face is in the water, the drill head with large diameter shall be used to open the hole, and the drill pipe shall be inserted to make the drill pipe 1-2 meters above the water surface, so as to prevent mud and rock slag from falling into the hole and blocking. The drill shall not be reversed during drilling operation to avoid the drill pipe falling into the hole. At the end of each shift, the dirt on the surface of the drilling rig must be cleaned in time. Except for normal handling, it is strictly prohibited to disassemble it on the working face.

As long as attention is paid to good maintenance and correct use, the service life of water well drilling rig can be increased.

High Speed Residential Water Well Borehole Blasting ST 180 Crawler Mounted Drill Rig 0

High Speed Residential Water Well Borehole Blasting ST 180 Crawler Mounted Drill Rig 1

 

 

 

 


 

 

 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Cathy

Tel: 86-13343314303

Fax: 86-0311-84397208

Send your inquiry directly to us (0 / 3000)