|
Product Details:
Payment & Shipping Terms:
|
Product Name: | DTH Hammer ST 180 Large Hole Diameter Deep Pneumatic Drilling Rig | Color: | Red Yellow |
---|---|---|---|
Feature: | High Drilling Efficiency | Usage: | Water Well,blast Borehole |
Application: | Water Well Drilling | Power Type: | Diesel |
Drilling Depth: | 180 Meters | Warranty: | 1 Year |
Voltage: | 220V/380V | Length Of Drill Pipe(mm): | 3m |
Condition: | New | Drilling Depths: | 180 Meters |
Highlight: | dth hammer pneumatic drilling rig,large hole diameter pneumatic drilling rig,oem pneumatic drill rigs |
Attribute | Value |
---|---|
Product Name | DTH Hammer ST 180 Large Hole Diameter Deep Pneumatic Drilling Rig |
Color | Red Yellow |
Feature | High Drilling Efficiency |
Usage | Water Well, blast borehole |
Application | Water Well drilling |
Power Type | Diesel |
Drilling Depth | 180 meters |
Warranty | 1 Year |
Voltage | 220V/380V |
Length of drill pipe | 3m |
Condition | New |
The ST 180 drilling rig is capable of drilling up to 180m with a drilling diameter of 105-180mm. It features a lifting force of 16t, tower height of 3M, and total machine weight of 4.5t. The rubber track design provides advantages including low noise, no road damage, minimal vibration, and high speed operation.
Drilling Rig Model | ST-180 | Air consumption(m³/min) | 17-31 |
Rig Weight(T) | 4.5 | Equipped capacitor(Kw) | 55 |
Dimensions(mm) | 3800*1550*2350 | Swing speed(rpm) | 45-65 |
The hole diameter(mm) | 140-254 | Swing torque(N.m) | 3200-4600 |
Drilling Depth(m) | 180 | Drill pipe diameter(mm) | 76 89 |
Stroke | 3.3 | Drill pipe length(m) | 1.5 2.0 3.0 |
Walking speed(Km/h) | 2.5 | Rig lifting force(T) | 10 |
Climbing angles(Max.) | 30 | Supporting Power | 29m3/min 23BAR AIR COMPRESSOR |
Air compressor (Mpa) | 1.7-2.5 |
We manufacture small hydraulic drilling rigs, water well drilling rigs, core drilling rigs, engineering drilling rigs, and geological exploration drilling rigs. We recommend suitable models based on your specific requirements.
Our factory is located in Jinzhou, Shijiazhuang City, Hebei Province, China.
We are a professional manufacturer with 20 years of experience and ISO certification, operating a large modern drilling rig plant in Hebei, China.
Small hydraulic drilling rigs typically take 5-7 days, while larger models require 7-15 days. Please contact our sales team in advance for urgent orders.
Contact Person: Cathy
Tel: 86-13343314303
Fax: 86-0311-84397208