Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Jinzhou City Shitan Machinery Equipment CO. LTD.
Home ProductsCrawler Mounted Drill Rig

150 Meters Soil Testing Exploration Drill Rig Crawler Mounted Xy-1a

Mr. Zhu is worth to be trust, he has a good team, they provide us good service and reliable quality cable.

—— Aaron

Mr. Zhu provide us Water Well Drilling Rig with good price. thank you.

—— Julien

I'm Online Chat Now

150 Meters Soil Testing Exploration Drill Rig Crawler Mounted Xy-1a

150 Meters Soil Testing Exploration Drill Rig Crawler Mounted Xy-1a
150 Meters Soil Testing Exploration Drill Rig Crawler Mounted Xy-1a 150 Meters Soil Testing Exploration Drill Rig Crawler Mounted Xy-1a

Large Image :  150 Meters Soil Testing Exploration Drill Rig Crawler Mounted Xy-1a

Product Details:
Place of Origin: China
Brand Name: JINZHOU SHITAN
Model Number: XY-1A
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiation
Packaging Details: Standard Export Package
Delivery Time: 7-12 days
Payment Terms: T/T, Western Union
Supply Ability: 2000 sets per year
Detailed Product Description
Certification: ISO9001 Drilling Rig: Crawler Mounted Drill Rig XY-1A
Type: Rotary Drilling Rig Power Type: Diesel
Usage: Water Well Drilling Rig,geological Exploration Voltage: 380V
Power(W): 15KW Weight: 1200KGS
Other Name: Drill Rig Drill Rod Diameter: 42, 50mm
Condition: New After-sales Service Provided: Video Technical Support
High Light:

150 meters exploration drill rig

,

xy-1a exploration drill rig

,

crawler mounted exploration drill rig

150 Meters Soil Testing Exploration Crawler Mounted Drill Rig XY-1A

 

 

Crawler Mounted Drill Rig XY-1A Introduction

 

XY-1A drilling rig is mainly used for geological general investigation and exploration, road and tall buliding foundation exploration, kinds of hole in concrete structure, river levees,earth temperature central air-conditioner,etc

 

Crawler Mounted Drill Rig XY-1A Parameters

 

Drill Swivel Head

Drilling depth

 

Max.150m

Spindle speed

 

1010,790,470,295,140(r/min)

Hole diameter

 

Max.150m Spindle stroke 450kmm
Drill rod diameter 42.50mm Spindle pull-down Max.15KN
Angle range 90-75 Spindle lifting capacity Max. 25KN
Oil pump Water pump
Model YBC-12/125 Model Horizontal reciprocating single-acting piston pump
Rated pressure 12.5Mpa Working pressure Max. 1.25Mpa
Flow speed 8ml/r    
Rated speed 1500r/min    
Hoist Power(diesel)
Max. lifting capacity 15KN Model(diesel engine) 1105
Hoisting drum revolution

121,76,36(r/min)

 

Rated power 18KW
Drum diameter 140mm Rated speed 2200r/m
WEIGHT AROUND 600KG
SIZE 1620*970*1560mm


Crawler Mounted Drill Rig XY-1A Features

 

1. With hydraulic feeding device, elevated drilling efficiency, reduced labor strength. 2. The rig is equipped with an upper spherical jaw holding mechanism and hexagonal kelly which can be replaced without shutdown, high efficiency, safe and reliable. 3. A hole bottom pressure gauge is mounted indicating the pressure in order to control the status inside the hole. 4. Compact structure, small volume, lightweight, high detachability, easy transportation and suitable for the operations in plains or mountain areas.

 

Our service of our drilling rigs 

 

We believe that only good quality can bring long term business, thus quality is our life. All the products with high quality meet international standards and are highly estimated by all clients at home and abroad.

All the staff in our company are professionally trained, so we can recommend you the most appropriate equipment. Every machine will be strictly examined before delivery. Any question about the machine will be replied within 24 hours. Welcome your inquiry!

 

Precautions for drilling machine working at low temperature

 

1. In the low temperature environment, the land will become hard, so when we choose the site, we need to have some requirements. The site needs to be flat and the road needs to be unblocked. This must be ensured.

2. The drilling machine mainly uses triangular support, especially in the case of low temperature, we should ensure that the support of the drilling machine is firm and reliable. Our staff need to regularly check and deal with hidden dangers in time once they are found. We must not be careless

3. Although we work at low temperature, we can not ignore the problem of fire prevention. The configuration of fire-fighting equipment must be reasonable and meet the fire-fighting requirements.

4. Low temperature, low temperature, what is the most important? Of course, our friends should pay attention to their warmth when working. Only when they are warm can we better put ourselves into work.

5. The temperature is low, which will definitely have certain impact on the construction. We must pay attention to warmth and safety

 

 

150 Meters Soil Testing Exploration Drill Rig Crawler Mounted Xy-1a 0

150 Meters Soil Testing Exploration Drill Rig Crawler Mounted Xy-1a 1150 Meters Soil Testing Exploration Drill Rig Crawler Mounted Xy-1a 2

 

 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Cathy

Tel: 86-13343314303

Fax: 86-0311-84397208

Send your inquiry directly to us (0 / 3000)