Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Jinzhou City Shitan Machinery Equipment CO. LTD.
Home ProductsWater Well Drilling Rig

260 Meters Water Well Borehole Drilling Rig Diesel Engine Customized

Mr. Zhu is worth to be trust, he has a good team, they provide us good service and reliable quality cable.

—— Aaron

Mr. Zhu provide us Water Well Drilling Rig with good price. thank you.

—— Julien

I'm Online Chat Now

260 Meters Water Well Borehole Drilling Rig Diesel Engine Customized

260 Meters Water Well Borehole Drilling Rig Diesel Engine Customized
260 Meters Water Well Borehole Drilling Rig Diesel Engine Customized 260 Meters Water Well Borehole Drilling Rig Diesel Engine Customized

Large Image :  260 Meters Water Well Borehole Drilling Rig Diesel Engine Customized

Product Details:
Place of Origin: China
Brand Name: SHITAN
Certification: ISO
Model Number: ST 260
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set
Price: 25000-30000 USD
Packaging Details: Wooden case (bare)
Delivery Time: 5-8days
Payment Terms: T/T, Western Union
Supply Ability: 1000/month
Detailed Product Description
Product Name: ST 260 Water Well Drilling Rig Drilling Diameter: 105-260mm
After-sales Service Provided: Video Support Warranty: 1 Year
Power Type: Diesel Color: Yellow
Weight: 6T Rotary Head Storke: 3.4m-6.0m
Rated Power: 55-132KW Optional Accessories: 70KW
Weight Of The Rig: 4m×1.7m×2.2m Air Pressure: 16-55m³/min
High Light:

Diesel Engine Borehole Drilling Machine

,

260M Water Well Borehole Drilling Rig

,

Customized Borehole Drilling Machine

St 260 Meters Large Horse Power Yuchai Diesel Engine Customized Borehole Water Well Drilling Rig Machine

 

 

ST 260 Water Well Drilling Rig Description

 

It can work on different formations, well drilling diameter up to 245mm. This is mainly applied in drilling wells, irrigation wells, geothermal wells and air holes for other purposes, especially for mountain and rock formation water engineering.Drilling Depth is 260 meters and use Yuchai diesel engine.

 

Tech Details

 

Hole Diameter φ105-260mm
Drilling Depth 260 meters
Working pressure 1.7-3.0MPa
Air consumption 17-35m³/min
Length of rod 1.5m,2m,3m,6m
Dia. Of rod φ76, φ89,φ102,φ114
Lifting power 24T
Rotation torque 8500-11000N.m
Rotation Speed 40-70r/min
Diesel Engine Yuchai
Engine Power 85Kw/2200rpm
Travelling speed 0-2.5 Km/h
Climb capacity 30°
Weight 9000kgs
Dimension 5900x2000x2850mm
Application Complicated geological conditions:Rock,Mud,Sand etc.
Drilling Way Top drive hydraulic rotary and propulsion,Dth Drilling or Mud Pump Driling
Dth Hammer 4",5",6",8" Drill hammer or CIR110, 130, 150,170

 

ST 260 Water Well Drilling Rig Features

 

1. Equipped with 75KW Yiqi brand turbocharged engine, strong power;
2. Patented design composite boom, double cylinder lift, long stroke, large tonnage
3. The main boom of each rig is equipped with a stopper to protect the cylinder;
4.Drilling machine chassis: professional excavator chassis ,durable,heavy bearing capacity,wide chain plate, less damage to hard road.
5.Parallel gearbox design, separate oil pump, sufficient power supply, reasonable distribution, unique design of hydraulic system,simple maintenance and low cost
6. The travel motor is equipped with reducer, durable and long service life;
7. Dust-reducing device: effectively reduce dust pollution, for potholes, tunnel construction.
8. Fast distribution valve: the speed of three gears up to 150-160 rpm, basically achieve the dual-use function of water and air
9. Each hydraulic hose is covered with soft management set to make the hose last longer.
10. The rig power is driven by the diesel engine, and the rig's walking, turning, propulsion, lifting, outriggers, and unloading
rods are all controlled by hydraulic pressure.

 

ST 260 Water Well Drilling Rig Application

 
The water welll drilling rigs are available in various models and sizes. These rigs are offered in various technical specifications as per the client’s specific need.is mainly applicable to industrial and civil drilling, geothermal drilling, has the advantages of compact structure, fast advancing, mobile and flexible wide application region etc.. Pneumatic well drill is especially suitable for water intake in

 

Precautions when working at low temperature

 

1. In the low temperature environment, the land will become hard, so when we choose the site, we need to have some requirements. The site needs to be flat and the road needs to be unblocked. This must be ensured.

2. The drilling machine mainly uses triangular support, especially in the case of low temperature, we should ensure that the support of the drilling machine is firm and reliable. Our staff need to regularly check and deal with hidden dangers in time once they are found. We must not be careless

3. Although we work at low temperature, we can not ignore the problem of fire prevention. The configuration of fire-fighting equipment must be reasonable and meet the fire-fighting requirements.

4. Low temperature, low temperature, what is the most important? Of course, our friends should pay attention to their warmth when working. Only when they are warm can we better put ourselves into work.

5. The temperature is low, which will definitely have certain impact on the construction. We must pay attention to warmth and safety

 

What aspects should we pay attention to in the drilling process of water well drilling rig?

 

Bit plays a very important role in the drilling of water well drilling rig, but the quality of a bit directly affects the efficiency and quality of water well drilling. Therefore, in the selection process, we should pay attention to the selection and use of lower bit. When we are operating the drill bit, we must pay attention to several aspects in order to better production and operation.

1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.

2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.

3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.

260 Meters Water Well Borehole Drilling Rig Diesel Engine Customized 0

260 Meters Water Well Borehole Drilling Rig Diesel Engine Customized 1
260 Meters Water Well Borehole Drilling Rig Diesel Engine Customized 2

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Cathy

Tel: 86-13343314303

Fax: 86-0311-84397208

Send your inquiry directly to us (0 / 3000)