Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Jinzhou City Shitan Machinery Equipment CO. LTD.
Home ProductsCrawler Track Undercarriage

Customization Drilling Rig Rubber Crawler Track Undercarriage Good Stability

Mr. Zhu is worth to be trust, he has a good team, they provide us good service and reliable quality cable.

—— Aaron

Mr. Zhu provide us Water Well Drilling Rig with good price. thank you.

—— Julien

I'm Online Chat Now

Customization Drilling Rig Rubber Crawler Track Undercarriage Good Stability

Customization Drilling Rig Rubber Crawler Track Undercarriage Good Stability
Customization Drilling Rig Rubber Crawler Track Undercarriage Good Stability Customization Drilling Rig Rubber Crawler Track Undercarriage Good Stability

Large Image :  Customization Drilling Rig Rubber Crawler Track Undercarriage Good Stability

Product Details:
Place of Origin: Jinzhou ,China
Certification: ISO
Model Number: Shitan T1
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Customzied Quotation list
Packaging Details: 1*20 FCL
Delivery Time: 5 days after advance payment
Payment Terms: T/T, Western Union
Supply Ability: 1000 Sets/month
Detailed Product Description
Brand Name: Shitan Product Name: Customized Design Drilling Rigs Rubber Crawler Track Undercarriage
Loading Capacity: Customized Raw Material: Alloy Steel
OEM: Acceptable Power: Diesel Engine
Warranty: 12 Month After Sale Service: Video Support
Application: Drilling Rigs Speed: Customized
High Light:

customization Rubber Crawler Track

,

customization Crawler Track Undercarriage

,

Crawler Track Undercarriage Good Stability

Customized Design Drilling Rigs Rubber Crawler Track Undercarriage

 

 

Product Description

 

The machine is mainly composed of six parts: working platform, crawler walking part, body, oil tank, hydraulic system and electrical system.Large working platform space, without many obstacles, and large available spaceThe traveling mechanism is composed of idler, roller, sprocket, track assembly, tension buffer device and left and right track brackets. The left and right tracks are driven by the left and right traveling hydraulic motors and sprockets respectively.

 

Product Tech Details

 

Type : 3 T/3.5T Bucket size: 2200*1700*500 mm
Size: 3400 *1720*1500mm Crawler material: Rubber material
Track ground length: 1600mm Loading &unloading method: Hydraulic dump
Motor size: 1115 Gear type: drawbar
Gear: +3 forward gear+1 reverse gear The height from the bottom of the bucket to the ground: 700 mm
Steering method: Clutch brake steering Start method: Electric start
Speed : 0-18 Kilometer per hour Crawler Width size: 1630 mm


Product Main Advantages

 

1: good stability. Thanks to the crawler structure, the crawler chassis can have very good stability because of its large contact area with the ground when running in application, and can ensure that its running effect is very stable.

Operation advantage

2: fast operation. Although compared with the chassis of other structures, the crawler chassis is running at a lower speed, but from its specific performance, it can still reach a faster running speed, and can fully meet everyone's requirements in terms of running speed.

Operation advantage

3: lasting operation. In terms of the specific performance of the crawler chassis in the application, it can achieve lasting operation by virtue of its own structure and performance advantages.

To sum up, the crawler chassis shows the advantages of good stability, fast running speed and long running. With these advantages, it will inevitably show very good running effect.

 

Product Main Applications

 

Crawler chassis assembly is mainly used for special occasions, such as military parade, tanks, armored vehicles, etc. What are its advantages: rubber track has the advantages of protecting the ground, rubber track walking system, low noise, low vibration, comfortable riding, etc. It is suitable for situations with high speed and many transfers, and achieves the all-road performance. Reliable electrical instruments and complete machine status monitoring system provide reliable assurance for the driver to operate correctly

Due to the different use methods and soil conditions, the working life of rubber track also varies greatly. Generally speaking, its average life is about 2000 hours. However, when working in rock or easily worn environment, the service life will be halved; On the contrary, the working life will be doubled in a better environment. When the user checks the track and chassis, don't forget to drive again to check the oil level and cleanliness. This part is easy to be ignored, and there is usually less oil left.

 

Product Working Attentions

 

(1) It is forbidden to turn sharply on the concrete ground or hard road, otherwise the track core will be worn and the belt body will be twisted.

(2) When crossing the ridge, it is necessary to move forward at a low speed at right angles to the ridge. When crossing the ridge with a height of more than 10 cm, it is necessary to use a springboard, otherwise the track may fall off or be damaged.

(3) It is forbidden to walk and turn sharply for a long time on the gravel road, otherwise the track will be accelerated, worn and cracked.

(4) Do not work on rotten fields, otherwise the track will slip and make the traveling mechanism accumulate mud and tangle grass, affecting the normal operation.

(5) If stones or foreign matters enter between the track and the underframe, stop the operation immediately and remove the stones or foreign matters.

(6) After working on the beach or in the field sprinkled with chemicals, the track shall be washed in time.

 

What are the regulations for the installation of drill tower guy ropes?

 

The derrick guy line is used to enhance the stability of the derrick and prevent it from collapsing due to strong winds. Therefore, it is required to set one guy line for each leg of the derrick below 17 meters, which is tied at 3/4 of the tower height, and one guy line for each leg of the derrick above 22 meters, which is tied at the top of the ceiling beam and at the waist of the tower. Generally, a guy rope with a diameter of 12.5 or 15.5mm is used, and its length should be determined based on the height of the drill tower. That is, the angle between the base point of the guy rope and the ground is generally not greater than 45 degrees. And the position of each tower leg guy line must be symmetrical. At the base point of the guy line in hard stratum, steel drill drilling can be used to drill holes, and then the steel drill, waste drill rod, or steel bar pin rod can be inserted into the eye hole and fixed with cement pouring. In soft ground, deep pits no less than 1 meter long can be dug, wooden piles or waste casings with a length of about 1 meter can be installed, filled with earth and rock, and compacted. After that, tighten the tensioner to tighten the tension rope.

Customization Drilling Rig Rubber Crawler Track Undercarriage Good Stability 0

Customization Drilling Rig Rubber Crawler Track Undercarriage Good Stability 1

Customization Drilling Rig Rubber Crawler Track Undercarriage Good Stability 2

Customization Drilling Rig Rubber Crawler Track Undercarriage Good Stability 3

Customization Drilling Rig Rubber Crawler Track Undercarriage Good Stability 4

 

 

 

 

 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Cathy

Tel: 86-13343314303

Fax: 86-0311-84397208

Send your inquiry directly to us (0 / 3000)