logo

Pneumatic Crawler Water Well Drilling Rig With Hydraulic Tower

Service Summary

Pneumatic Crawler Water Well Drilling Rig With Hydraulic Tower Key Specifications Drilling Depth 180m Drilling Diameter 105-305mm Drill Pipe Length 3m Engine Power Xidong 55 KW Walking Speed 2.5km/h Working Wind Pressure 1.25-3.5 Mpa Overall Dimensions 3.4*1.8*2.3m Weight 4.5T Product Overview The ...

Inquiry Now
Inquiry Now
Service Description
Pneumatic Crawler Water Well Drilling Rig With Hydraulic Tower
Key Specifications
Drilling Depth 180m
Drilling Diameter 105-305mm
Drill Pipe Length 3m
Engine Power Xidong 55 KW
Walking Speed 2.5km/h
Working Wind Pressure 1.25-3.5 Mpa
Overall Dimensions 3.4*1.8*2.3m
Weight 4.5T
Product Overview

The ST 180 water well drilling rig is a lightweight, efficient, and multifunctional drilling equipment designed for industrial and civil drilling applications, including geothermal drilling. Its compact structure, fast advancing capability, and mobility make it suitable for various terrains, particularly mountainous and rocky strata for water intake projects.

Technical Parameters
Shaft Pressure 4T
Lifting Force 16T
Lifting Speed 20m/min
Fast Forward Speed 40m/min
Maximum Turning Torque 5900
Maximum Rotation Speed 85/170r/min
Air Consumption 16-55m³/min
Drilling Method Top drive hydraulic rotation and propulsion, DTH impactor or Mud drilling
Support & Services

We provide comprehensive technical support and services to ensure optimal performance of your pneumatic drilling rig. Our experienced technicians offer assistance with installation, operation, and maintenance, along with operator training. Services include regular maintenance inspections, repairs, part replacements, and efficiency upgrades to maximize productivity.

Product Gallery
Service Custom Attributes

Highlight

Pneumatic Crawler Water Well Drilling Rig

,

Crawler Water Well Drilling Rig

,

Hydraulic Tower Pneumatic Drilling Rig

Drilling Rod Length:
3m
Drilling Depth:
180m
Drilling Diameter:
105-305mm
Walking Speed:
2.5km/h
Working Wind Pressure:
1.25-3.5 Mpa
Overall Dimension:
3.4*1.8*2.3m
Climbing Speed:
20m/min
Footage Efficiency:
10-35m/h
Engine:
Xidong 55 KW
Drill Pipe Diameter:
76mm