The precautions for using GY-200 drilling rig
The precautions for using GY-200 drilling rig mainly include the following points:
Pre operation inspection: Before using GY-200 drilling rig, it is necessary to check whether all components are intact, including drill rods, drill bits, transmission devices, etc., to ensure that there is no damage or looseness. At the same time, check whether the lubricating oil and coolant are sufficient to ensure that the equipment is in good condition
Safety operating procedures: During the operation process, it is necessary to strictly follow the safety operating procedures. Operators should wear necessary protective equipment, such as safety helmets, protective goggles, etc. When operating, pay attention to the surrounding environment, avoid collisions and squeezing, and ensure that the work area is free of debris interference
Correct installation and debugging: When installing the drilling rig, ensure that all components are firmly connected and the transmission device is adjusted to the optimal state. Before operation, a no-load test should be conducted to check if all parts are running normally and there are no abnormal noises or vibrations
Maintenance: Regularly maintain the drilling rig, including cleaning the lubrication system, checking for loose fasteners, replacing worn parts, etc. Keep the equipment clean to prevent dust and debris from entering the interior of the machinery and affecting its normal operation
.
Troubleshooting: If any malfunction occurs during use, the machine should be stopped immediately for inspection. Common faults include transmission device jamming, lubrication system failure, etc., which should be investigated and repaired according to specific situations. If necessary, contact professional maintenance personnel for inspection and repair
Contact Person: Ms. Anna
Tel: +8615511892512
Fax: 86-0311-84397208