Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Jinzhou City Shitan Machinery Equipment CO. LTD.
Home ProductsPneumatic Drilling Rig

180 Meter Depth Water Well Drilling Rig Machine Portable Diesel Engine

Mr. Zhu is worth to be trust, he has a good team, they provide us good service and reliable quality cable.

—— Aaron

Mr. Zhu provide us Water Well Drilling Rig with good price. thank you.

—— Julien

I'm Online Chat Now

180 Meter Depth Water Well Drilling Rig Machine Portable Diesel Engine

180 Meter Depth Water Well Drilling Rig Machine Portable Diesel Engine
180 Meter Depth Water Well Drilling Rig Machine Portable Diesel Engine
video play

Large Image :  180 Meter Depth Water Well Drilling Rig Machine Portable Diesel Engine

Product Details:
Place of Origin: China
Brand Name: ShiTan
Certification: ISO9001
Model Number: ST 180
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiation
Packaging Details: Wooden box
Delivery Time: Within 7-12 days
Payment Terms: T/T, Western Union
Supply Ability: 50000 sets per year
Detailed Product Description
Product Name: ST 180 Large Water Well Drilling Rig,High Drilling Speed Pneumatic Crawler Mounted Drill Rig Machine Color: Red Yellow
Feature: High Drilling Efficiency Usage: Water Well,exploration,soil Testing
Application: Water Well Drilling Power Type: Diesel Engine
Drilling Depth: 180 Meters Warranty: 1 Year
Voltage: 220V/380V Length Of Drill Pipe(mm): 3m
High Light:

180m water well drilling rig machine

,

diesel water well drilling rig machine

,

180 meter depth pneumatic rig

180 Meter Depth Portable Diesel Engine Water Well Drilling Rig Machine

 

 

ST 180 Crawler Mounted Drilling Rig Introduction

 

ST 180 series water well drilling rig is a light, efficient and multi-functional drilling and drilling equipment. It is mainly suitable for industrial and civil drilling and geothermal drilling. It has the advantages of compact structure, fast footage, flexible movement and wide application area. It is especially suitable for taking water from mountainous and rocky strata.

This machine can be applied to various formations, such as water well engineering, geothermal wells, anchor pile holes, etc., and can use heel drills. It has the advantages of hydraulic control of the whole machine, automatic loading and unloading of drill pipe, crawler type chassis, high horsepower diesel engine, four-corner hydraulic balance and stronger terrain application ability.

 
ST 180 Crawler Mounted Drilling Rig Tech Information 

 

Model  ST 180
Drill Mast(m) 3
Chassis Rubber track
Drilling diameter(mm) 130-254
Drilling depth(m) 180
one-time advance length(m) 3.6
Walking Speed(km/h) 2.5
Gradeability 30
Engine brand Yunnei
Main motor power 42kw
Working pressure(mpa) 1.45-2.5
Air consumption(m³/min) 17-31
Drill pipe diameter(mm) 76/89
Drill pipe length(m) 1.5/2.0/3.0
Lifting force(t) 12
Rotating speed(rpm) 40-65
Rotary torque(N.m) 3500-3800
Dimensions 3500*1700*2250
Machine weight(t) 4.5


ST 180 Crawler Mounted Drilling Rig Features

 

1, The engine using qianchai 55Kw turbocharged diesel engine;
2 Walking devices: walking motor with gear box, long working life;
3, The hydraulic pump: parallel gearbox design (patent) separate pump, the power to provide adequate distribution, unique hydraulic system design, maintenance is simple with lower costs;
4, The power head device: gearbox casting, double motor to provide power, large torque, durability, maintenance cost is lower;
5, Rig chassis: professional digging machine rubber chassis, durable, large bearing capacity, wide chain plate, which has no damage to the hard road;
6, The lifting force: patented design compound arm, arm in small size, long stroke, double cylinder upgrade, lifting with large tonnage;
7, Lifting arms of each rig are installed limiter to protect the cylinder safety cylinder and to protect the security of the work process;
8, Each of the hydraulic oil tube are wrapped with protective jacket, which make the oil tubes have a longer service time.

 

How to run the casing after well water welling?

 

Before placing the well pipe, four steel pipes shall be used to make a well shaped device, and the steel wire rope shall be wound on the two steel pipes. If you want to go down quickly, it shall be wound twice. If you want to be stable, it shall be wound three times. Check whether the steel wire rope is knotted, bent, wound or burred. When placing the well pipe, the steel wire rope shall begin to bear each well pipe, Continuously superimposed weight load.

How can a person change the drill pipe? First, pinch one end of the locking handle with the cushion fork, pull a three meter drill pipe into the hole with the puller, remove the puller, close the closing box, pull down the operating handle of the drilling rig ect

 

180 Meter Depth Water Well Drilling Rig Machine Portable Diesel Engine 0

180 Meter Depth Water Well Drilling Rig Machine Portable Diesel Engine 1

180 Meter Depth Water Well Drilling Rig Machine Portable Diesel Engine 2

180 Meter Depth Water Well Drilling Rig Machine Portable Diesel Engine 3180 Meter Depth Water Well Drilling Rig Machine Portable Diesel Engine 4


 
 
 
 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Anna

Tel: 86-15630441112

Fax: 86-0311-84397208

Send your inquiry directly to us (0 / 3000)