Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Jinzhou City Shitan Machinery Equipment CO. LTD.
Home ProductsCrawler Mounted Drill Rig

260m Deep Borehole Crawler Drill Rig 105mm Diameter

Mr. Zhu is worth to be trust, he has a good team, they provide us good service and reliable quality cable.

—— Aaron

Mr. Zhu provide us Water Well Drilling Rig with good price. thank you.

—— Julien

I'm Online Chat Now

260m Deep Borehole Crawler Drill Rig 105mm Diameter

260m Deep Borehole Crawler Drill Rig 105mm Diameter
260m Deep Borehole Crawler Drill Rig 105mm Diameter 260m Deep Borehole Crawler Drill Rig 105mm Diameter

Large Image :  260m Deep Borehole Crawler Drill Rig 105mm Diameter

Product Details:
Place of Origin: China
Brand Name: SHITAN
Certification: ISO
Model Number: ST 260
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set
Price: 25000-30000 USD
Packaging Details: Wooden case (bare)
Delivery Time: 5-8days
Payment Terms: T/T, Western Union
Supply Ability: 1000/month
Detailed Product Description
Product Name: Pneumatic Drilling Rig ST 260 Drilling Diameter: 105-260mm
After-sales Service Provided: Water Well Drilling Rig Warranty: 1 Year
Power Type: Diesel Color: Yellow
Weight: 6T Rotary Head Storke: 3.4m-6.0m
Rated Power: 55-132KW Weight Of The Rig: 4m×1.7m×2.2m
High Light:

260m deep crawler drill rig

,

105mm diameter crawler drill rig

,

crawler mounted borehole drilling rig

260m Crawler Mounted Deep Borehole Water Well Drilling Rig Machine For Sale

 

 

ST 260 Pneumatic Drilling Rig Description

 

ST 260 Pneumatic Drilling Rig  Multi-functional track mounted water well drilling rig is a efficient,multi-function full hydraulic water well drilling rig.It is high efficiency because of having a larger torque of the turntable and is mainly used for water well in industry and agriculture, national defense building foundation, geological exploration, geothermic well and other foundation working, it is popular at home and abroad.

 

ST 260 Pneumatic Drilling Rig Tech Details

 

Hole Diameter φ105-260mm
Drilling Depth 260 meters
Working pressure 1.7-3.0MPa
Air consumption 17-35m³/min
Length of rod 1.5m,2m,3m,6m
Dia. Of rod φ76, φ89,φ102,φ114
Lifting power 24T
Rotation torque 8500-11000N.m
Rotation Speed 40-70r/min
Diesel Engine Yuchai
Engine Power 85Kw/2200rpm
Travelling speed 0-2.5 Km/h
Climb capacity 30°
Weight 9000kgs
Dimension 5900x2000x2850mm
Application Complicated geological conditions:Rock,Mud,Sand etc.
Drilling Way Top drive hydraulic rotary and propulsion,Dth Drilling or Mud Pump Driling
Dth Hammer 4",5",6",8" Drill hammer or CIR110, 130, 150,170

 

ST 260 Pneumatic Drilling Rig Features

 

1. Guangxi Yuchai 77Kw turbocharged engine;
2. Walking device: walking motor reducer box, durable long life;
3. Hydraulic oil pump; parallel gearbox design (patent) oil pump monomer separation, power supply adequate distribution reasonable, hydraulic system unique design, simple maintenance, small cost;
4. Power head device, gearbox integrated casting, dual motor power, torque, durability, small maintenance costs;
5. Drill chassis; professional excavator chassis, durable, high bearing weight, chain plate width, small damage to the hard surface;
6. Lifting force; patent design composite big arm, big arm small volume, long stroke, double cylinder lifting, lifting tonnage;
7. Each drill hoist arm is installed limiter, protect the cylinder safety, ensure the safety of work;

8. Each hydraulic tubing is covered with a protective sleeve, so that the tubing life longer..

rods are all controlled by hydraulic pressure.

 

ST 260 Pneumatic Drilling Rig Application
 
The water welll drilling rigs are available in various models and sizes. These rigs are offered in various technical specifications as per the client’s specific need.is mainly applicable to industrial and civil drilling, geothermal drilling, has the advantages of compact structure, fast advancing, mobile and flexible wide application region etc.. Pneumatic well drill is especially suitable for water intake in

 

Precautions during operation of water well drilling rig:


1. Before drilling, the drilling rig shall be constructed in strict accordance with the hole location, orientation, angle and depth
2. Ensure that the drill pipe is not blocked, bent or cracked when installing it.
3. When clean water drilling is adopted, water supply is not allowed before spudding, and pressure drilling can only be carried out after the water returns. Sufficient flow shall be ensured, and dry drilling is not allowed. When there is much rock powder in the hole, water shall be increased to extend the pumping time, and drilling can only be stopped after the hole is effectively flushed.
4. During drilling, the distance shall be measured accurately. Generally, the drill pipe must be measured every 10m of drilling or when the drilling tool is changed, and the hole depth shall be verified and relevant records shall be made. 5. Check the gearbox, shaft sleeve, horizontal and vertical shaft gear, etc. for overheating and abnormal sound. If any problem is found, stop the machine immediately to find out the cause and deal with it in a timely manner. Don't leave the problem unsolved. As a result, mechanical damage is very fast and maintenance costs are high over the years.

 

260m Deep Borehole Crawler Drill Rig 105mm Diameter 0

260m Deep Borehole Crawler Drill Rig 105mm Diameter 1

260m Deep Borehole Crawler Drill Rig 105mm Diameter 2260m Deep Borehole Crawler Drill Rig 105mm Diameter 3260m Deep Borehole Crawler Drill Rig 105mm Diameter 4

 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Anna

Tel: 86-15630441112

Fax: 86-0311-84397208

Send your inquiry directly to us (0 / 3000)