Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Jinzhou City Shitan Machinery Equipment CO. LTD.
Home ProductsCrawler Track Undercarriage

Customization Capacity Crawler Track Undercarriage For Engineering Drilling Machines

Mr. Zhu is worth to be trust, he has a good team, they provide us good service and reliable quality cable.

—— Aaron

Mr. Zhu provide us Water Well Drilling Rig with good price. thank you.

—— Julien

I'm Online Chat Now

Customization Capacity Crawler Track Undercarriage For Engineering Drilling Machines

Customization Capacity Crawler Track Undercarriage For Engineering Drilling Machines
Customization Capacity Crawler Track Undercarriage For Engineering Drilling Machines Customization Capacity Crawler Track Undercarriage For Engineering Drilling Machines

Large Image :  Customization Capacity Crawler Track Undercarriage For Engineering Drilling Machines

Product Details:
Place of Origin: Jinzhou ,China
Certification: ISO
Model Number: Shitan T1
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Customzied Quotation list
Packaging Details: 1*20 FCL
Delivery Time: 5 days after advance payment
Payment Terms: T/T, Western Union
Supply Ability: 1000 Sets/month
Detailed Product Description
Brand Name: Shitan Product Name: Customization Loading Capacity Crawler Track Undercarriage For Engineering Drilling Machines
Loading Capacity: Customized Raw Material: Alloy Steel
OEM: Acceptable Power: Diesel Engine
Warranty: 12 Month After Sale Service: Video Support
Application: Drilling Rigs Speed: Customized
High Light:

Customization Crawler Track Undercarriage

,

Customization steel track undercarriage

,

Drilling Machines Crawler Track Undercarriage

Customization Loading Capacity Crawler Track Undercarriage For Engineering Drilling Machines

 

 

Product Description

 

The machine is mainly composed of six parts: working platform, crawler walking part, body, oil tank, hydraulic system and electrical system.Large working platform space, without many obstacles, and large available spaceThe traveling mechanism is composed of idler, roller, sprocket, track assembly, tension buffer device and left and right track brackets. The left and right tracks are driven by the left and right traveling hydraulic motors and sprockets respectively.

 

Product Tech Details

 

Type : 3 T/3.5T Bucket size: 2200*1700*500 mm
Size: 3400 *1720*1500mm Crawler material: Rubber material
Track ground length: 1600mm Loading &unloading method: Hydraulic dump
Motor size: 1115 Gear type: drawbar
Gear: +3 forward gear+1 reverse gear The height from the bottom of the bucket to the ground: 700 mm
Steering method: Clutch brake steering Start method: Electric start
Speed : 0-18 Kilometer per hour Crawler Width size: 1630 mm


Product Main Advantages


(1). Less round damage
Rubber tracks cause less damage to roads than steel tracks, and less rutting of soft ground than either steel tracks of wheel products.
(2). Low noise
A benefit to equipment operating in congested areas, rubber track products less noise than steel tracks.
(3). High speed
Rubber track permit machines to travel at a higher speed than steel tracks.
(4). Less vibration
Rubber tracks insulate machine and operator from vibration, extending the machine's lifetime and lowering operate fatigue.
(5). Low ground pressure
The ground pressure of rubber tracks equipped machinery can be fairly low, about 0.14-2.30 kg/ CMM, a major reason for its use on the wet and soft terrain.
(6). Superior traction
The added traction of rubber, track vehicles permits them to pull twice the load of wheel vehicles of the sane weight. antages of good stability, fast running speed and long running. With these advantages, it will inevitably show very good running effect.

 

Product Main Applications

 

Crawler chassis assembly is mainly used for special occasions, such as military parade, tanks, armored vehicles, etc. What are its advantages: rubber track has the advantages of protecting the ground, rubber track walking system, low noise, low vibration, comfortable riding, etc. It is suitable for situations with high speed and many transfers, and achieves the all-road performance. Reliable electrical instruments and complete machine status monitoring system provide reliable assurance for the driver to operate correctly

Due to the different use methods and soil conditions, the working life of rubber track also varies greatly. Generally speaking, its average life is about 2000 hours. However, when working in rock or easily worn environment, the service life will be halved; On the contrary, the working life will be doubled in a better environment. When the user checks the track and chassis, don't forget to drive again to check the oil level and cleanliness. This part is easy to be ignored, and there is usually less oil left.

 

Product Working Attentions

 

(1) It is forbidden to turn sharply on the concrete ground or hard road, otherwise the track core will be worn and the belt body will be twisted.

(2) When crossing the ridge, it is necessary to move forward at a low speed at right angles to the ridge. When crossing the ridge with a height of more than 10 cm, it is necessary to use a springboard, otherwise the track may fall off or be damaged.

(3) It is forbidden to walk and turn sharply for a long time on the gravel road, otherwise the track will be accelerated, worn and cracked.

(4) Do not work on rotten fields, otherwise the track will slip and make the traveling mechanism accumulate mud and tangle grass, affecting the normal operation.

(5) If stones or foreign matters enter between the track and the underframe, stop the operation immediately and remove the stones or foreign matters.

(6) After working on the beach or in the field sprinkled with chemicals, the track shall be washed in time.

 

What are the regulations for the installation of drill tower guy ropes?

 

The derrick guy line is used to enhance the stability of the derrick and prevent it from collapsing due to strong winds. Therefore, it is required to set one guy line for each leg of the derrick below 17 meters, which is tied at 3/4 of the tower height, and one guy line for each leg of the derrick above 22 meters, which is tied at the top of the ceiling beam and at the waist of the tower. Generally, a guy rope with a diameter of 12.5 or 15.5mm is used, and its length should be determined based on the height of the drill tower. That is, the angle between the base point of the guy rope and the ground is generally not greater than 45 degrees. And the position of each tower leg guy line must be symmetrical. At the base point of the guy line in hard stratum, steel drill drilling can be used to drill holes, and then the steel drill, waste drill rod, or steel bar pin rod can be inserted into the eye hole and fixed with cement pouring. In soft ground, deep pits no less than 1 meter long can be dug, wooden piles or waste casings with a length of about 1 meter can be installed, filled with earth and rock, and compacted. After that, tighten the tensioner to tighten the tension rope.

Customization Capacity Crawler Track Undercarriage For Engineering Drilling Machines 0

 

Customization Capacity Crawler Track Undercarriage For Engineering Drilling Machines 1

Customization Capacity Crawler Track Undercarriage For Engineering Drilling Machines 2Customization Capacity Crawler Track Undercarriage For Engineering Drilling Machines 3Customization Capacity Crawler Track Undercarriage For Engineering Drilling Machines 4Customization Capacity Crawler Track Undercarriage For Engineering Drilling Machines 5

Customization Capacity Crawler Track Undercarriage For Engineering Drilling Machines 6

 

 

 

 

 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Cathy

Tel: 86-13343314303

Fax: 86-0311-84397208

Send your inquiry directly to us (0 / 3000)