Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Jinzhou City Shitan Machinery Equipment CO. LTD.
Home ProductsEngineering Drilling Rig

Gy 200 Engineering Drilling Rig High Speed Efficiency 300 Meters Depth

Mr. Zhu is worth to be trust, he has a good team, they provide us good service and reliable quality cable.

—— Aaron

Mr. Zhu provide us Water Well Drilling Rig with good price. thank you.

—— Julien

I'm Online Chat Now

Gy 200 Engineering Drilling Rig High Speed Efficiency 300 Meters Depth

Gy 200 Engineering Drilling Rig High Speed Efficiency 300 Meters Depth
Gy 200 Engineering Drilling Rig High Speed Efficiency 300 Meters Depth
video play

Large Image :  Gy 200 Engineering Drilling Rig High Speed Efficiency 300 Meters Depth

Product Details:
Place of Origin: China
Certification: ISO
Model Number: Gy 200
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiation
Packaging Details: Standard Export Package
Delivery Time: 7-12 days
Payment Terms: L/C, D/A, D/P, T/T, Western Union
Supply Ability: 2000 sets per year
Detailed Product Description
Brand Name: Shitan Product Name: GY200 Engineering Drilling Rig
Condition: New Type: Rotary Drilling Rig
Voltage: 220V Model: GY 200
Warranty: 1 Year Drilling Diameter: Customized
Drilling Depth: 300 Meters Application: Water Well Drilling ,exploration ,soil Testing ,core Drilling
OEM: Acceptable Material: Steel
High Light:

high speed exploration drill rigs

,

300 meters depth engineering drilling rig

,

high efficiency engineering drilling rig

GY 200 High Speed Drilling Efficiency 300 meters Depth Engineering Drilling Rig

 

 

GY 200 Engineering Drilling Rig Product Description:

 

Portable Rotary GY 200 Engineering Drilling Rig for the general exploration and investigation of solid mineral deposit, engineering geotectonic survey and concrete structure inspection holes.

 

 

GY 200 Engineering Drilling Rig Product Parameter:

 

Basic Parameter
Drilling depth 60m 225m 295m
Drilling diameter 300mm 76mm 46mm
Drill pipe diameter 50   42
Spindle turnable angle 0°~ 360°
Weight without engine 750 kg
Dimension (length * width * height) 1820 * 980 * 1400 mm
Rotary Table
Rotate speed 900, 475, 388, 205, 157, 68 r/min
Maximum torque 2000 N*m
Feeding travel 400 mm
Maximum cylinder feeding force 29 KN
Maximum cylinder lifting force 39 KN
Lifter
Lifting capacity 30 KN
Bobbin line speed, 2nd layer 0.27, 0.64, 0.83, 1.58, 1.64 m/s
Bobbin diameter 135 mm
Rope diameter 12.5 mm
Rope capacity 30 m
Oil pump
Displacement 20 Ml/R
Rated speed 2500 r/min
Rated pressure 20 MPa
Maximum pressure 25 MPa
Power
Rated power 14 KW (Y160-4 electric), 14.7 KW (ZS-1115 diesel)
Rated speed 1460 r/min (Y160-4 electric), 2200 r/min (ZS-1115 diesel)
Weight 144 kg (Y160-4 electric), 190 kg (ZS-1110 diesel)
Frame
Type Sliding type with base frame
Movable travel of drill 400 mm
Distance between drill and hole-opening 270 mm

 

GY 200 Engineering Product Features:

1. Diesel engine and electric motor as power.(convenient for places of insufficient of electricity)
2. Integrative Drilling Tower:
Tower is supported by two high strength oil cylinder, hydraulic controlling the rise and fall of the tower. The operation is extremely convenient, saving time and labor effort,creating maximum benefit for the user.
3. Crawler mobile base :
The chassis used crawler type achieve rapid turnarounds, very convenient for movement.

4. Long stroke hydraulic supporting leg can be used for transportation, loading and unloading of the drill automatically without the help of the lifting equipment. The hydraulic leg can rapidly make the drill level in the coordination with the universal level instrument.
5. electric-start diesel engine:
It greatly reduces the labor intensity of operators, especially more efficient in the cold season when the diesel engine start is difficult, showing its great advantage.
6. The machine is equipped with a complete set of independent BW - 160 mud pump, with high pump flow rate and pressure, convenient maintenance, convenient to buy spare and accessory parts all around.

7. BW-160 mud pump is mounted on the rig, which is more practical in operation and save more space.

 

How to Start drilling:

 

Push on the clutch handle and reducer handle, the mud pump starts to supply water, press the hydraulic right handle and rotate the left handle pressure regulating valve to start drilling. When the vertical shaft of the rotator falls to the bottom, pull down the clutch handle to cut off the power. Lift the support ring, lift the right hydraulic handle up to the up position, press the left hydraulic handle, lift the vertical shaft to the highest position, press the support ring, push up the clutch handle, press the right hydraulic handle down to the down position, start drilling again, operate repeatedly according to the above operation mode until the maximum drilling depth of the active drill pipe is reached, and then replace and install the drill pipe.

 

Gy 200 Engineering Drilling Rig High Speed Efficiency 300 Meters Depth 0Gy 200 Engineering Drilling Rig High Speed Efficiency 300 Meters Depth 1Gy 200 Engineering Drilling Rig High Speed Efficiency 300 Meters Depth 2

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Cathy

Tel: 86-13343314303

Fax: 86-0311-84397208

Send your inquiry directly to us (0 / 3000)