Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Jinzhou City Shitan Machinery Equipment CO. LTD.
Home ProductsGeological Drilling Rig Machine

GK 200 Mining Exploration Geological Drilling Rig 180 Meters Depth

Mr. Zhu is worth to be trust, he has a good team, they provide us good service and reliable quality cable.

—— Aaron

Mr. Zhu provide us Water Well Drilling Rig with good price. thank you.

—— Julien

I'm Online Chat Now

GK 200 Mining Exploration Geological Drilling Rig 180 Meters Depth

GK 200 Mining Exploration Geological Drilling Rig 180 Meters Depth
GK 200 Mining Exploration Geological Drilling Rig 180 Meters Depth
video play

Large Image :  GK 200 Mining Exploration Geological Drilling Rig 180 Meters Depth

Product Details:
Place of Origin: China
Brand Name: ShiTan
Certification: ISO9001
Model Number: GK-200
Payment & Shipping Terms:
Minimum Order Quantity: Negotiation
Price: Negotiation
Packaging Details: Standard export transportation package
Delivery Time: Within 7-12 days
Payment Terms: T/T, Western Union
Supply Ability: 2000Set/Year
Detailed Product Description
Production Name: GK 200 Geological Drilling Rig Model: GK-200
Drilling Depth: 200 Meters Drilling Hole Diameter: Customized
Power: Diesel Engine Application: Engineering ,Coring And Sampling
Voltage:: 220v Weight:: 600kg
High Light:

mining exploration geological drilling rig

,

300mm hole diameter geological drilling rig

,

high speed engineering geological drill rig

200 Meters Drilling Depth Mining Exploration Geological Drilling Rig Machine

 

 

GK 200 Geological Drilling Rig Introduction 

 

The drilling rig is suitable for engineering geological survey of buildings such as civil engineering, railways, hydropower, transportation, bridges, dam foundations, etc.; geological core drilling and physical exploration; small grouting holes, geothermal holes, blasting holes, drilling of various concrete detecting holes Advance; small well drilling, small pile hole.

 

GK 200 Geological Drilling Rig Tech Parameter
 
Drilling Rig Product Model
Drilling diameter(mm) 75,91,110,130,150,300
Drilling depth (m) 200,150,100,70,50,30
Drill pipe diameter (mm) 42,50
Drilling angle(°) 90~75
Equipment size(L * B * H) 1730 * 860 * 1360 (mm)
Rig weight (except engine) 700
Mobile device
Moving length 350mm
Leave distance 300mm
Gyrator
Spindle speed (four gear) (r/min) 115,230,505,1010
Spindle travel(mm) 450
Spindle no-load lifting maximum moving speed(m/s) 0.05
Spindle no load drop maximum movement speed(m/s) 0.067
Spindle maximum feed pressure(KN) 15
Spindle maximum lifting force(KN) 25
Spindle maximum output torque(KN• m) 1.5
Winch assembly
Winch maximum lifting force (single rope) 20
Reel speed (r/min) 20,39,85,170
Reel circumferential speed(m/s) 0.172, 0.345, 0.738, 1.476
Reel diameter(mm) 140
Wire rope diameter(mm) 9.3
Wire rope density (m) 40
Brake diameter(mm) 278
Brake band width (mm) 50
Pump type Horizontal single cylinder double acting
Maximum displacement (motor)(L/min) 95 (77)
The maximum allowable pressure (Mpa) 1.2
Work pressure (Mpa) 0.7
Cylinder diameter (mm) 80
Piston stroke(mm) 100
Oil pump
Oil pump type YBC-20/125
Nominal pressure (Mpa) 12.5
Rated flow(ml/r) 20
Rated speed(r/min) 800-2500
Diesel engine or motor
Diesel engine 1110
Rated power (KW) 16.2
Rated speed (r/min) 2200
Rated pressure(Mpa) 12.5
Motor type Y160M - 4
Rated power (KW) 11
Rated speed (r/min) 1460

 

GK 200 Engineering Drilling Rig Advantages

 

(1) It has automatic hydraulic feeding mechanism to improve drilling efficiency and reduce the physical labor intensity of workers.
(2) The ball card clamping mechanism is used instead of the chuck, and the clamping positioning mechanism is provided to implement the non-stop rewinding.
(3) It is equipped with a bottom pressure gauge to indicate the pressure, which is convenient for grasping the inside of the hole.
(4) The handle is concentrated and easy to operate.
(5) Compact structure, the rig and the power machine are all installed on the same base, occupying a small area.
(6) Light weight, high decomposability, easy to relocate, suitable for work in plain or mountainous areas.
(7) It is equipped with a safety shield, which highlights the humanized design features of the equipment.
(8) The fixing nut is installed at the joint between the lower end of the feed cylinder and the vertical shaft box, which improves the reliability of the drilling rig.

 

Drilling Attentions Before Reaching the Sand Layer

 

First , mix a pool of mud for standby in advance and replace it in time before reaching the sand layer. When the bit passes through the sand layer, the mud will paste the sand,how do you like this method?

 

GK 200 Mining Exploration Geological Drilling Rig 180 Meters Depth 0

GK 200 Mining Exploration Geological Drilling Rig 180 Meters Depth 1GK 200 Mining Exploration Geological Drilling Rig 180 Meters Depth 2GK 200 Mining Exploration Geological Drilling Rig 180 Meters Depth 3

GK 200 Mining Exploration Geological Drilling Rig 180 Meters Depth 4

GK 200 Mining Exploration Geological Drilling Rig 180 Meters Depth 5

 
 
 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Cathy

Tel: 86-13343314303

Fax: 86-0311-84397208

Send your inquiry directly to us (0 / 3000)